A stochastic network model is built by use of the theory and method of Monte Carlo Simulation, with a view to analyzing the risk of the time limit for project and its cost.
建立一个工期和费用估计的随机网络模型,说明应用蒙特卡洛模拟进行工期和费用风险分析的原理及方法。
Based on energy random analysis theory for derailment, a new method for analyzing the limit value of bridge lateral rigidity for derailment prevention is established.
基于列车脱轨能量随机分析理论,提出新的铁路桥梁横向刚度限值分析方法。
By analyzing the real stress - strain curve with theory of plastic instability and using this testing method, another form of the forming limit diagram has been found.
在利用共稳理论对实际应力应变曲线进行分析的同时,得出了求作板材成形极限图的新方法。
Density evolution is a new method for analyzing the asymptotic performance of near capacity limit error-correcting codes.
密度进化方法是分析现代高效纠错编译码渐近性能的新方法。
In order to further speed the algorithm, a rapid sub-optimal loading algorithm is also presented based on analyzing the bit loss superior limit of the method.
为了进一步提高算法的运算速度,在分析比特分配损失上限的基础上,提出一种快速的次优分配算法。
Secondly, we studied the low limit of quantitative analysis and energy resolving capability of the method by analyzing the Monte Carlo simulation spectra.
其次,通过分析MonteCarlo模拟谱数据,对该方法的定量分析下限和能量分辨率能力进行了 研究。
Secondly, we studied the low limit of quantitative analysis and energy resolving capability of the method by analyzing the Monte Carlo simulation spectra.
其次,通过分析MonteCarlo模拟谱数据,对该方法的定量分析下限和能量分辨率能力进行了 研究。
应用推荐