Part 1: project introduction; high-level planning.
第1部分:项目介绍;高层次计划。
Leads high-level planning work sessions for program plan and schedule development.
领导针对计划和进度开发的高层计划工作会议。
Very high level planning is completed for the entire project but it is superficial and subject to change.
项目初期会为整个项目做高层次的计划,但是计划的粒度比较粗且常会变更。
Jim Goughenour, former VP and CTO of Sealy, Inc., adopted an interesting alternative to management by task-level planning.
JimGoughenour,Sealy公司的前副总和首席技术官,采用了一种不同而有趣的任务层面计划管理方法。
This phase shares many characteristics of what RUP calls the Inception phase in that it focuses on the vision, the business case, and the high-level planning.
这一阶段与RUP称作“初始阶段”的阶段有着许多相似的特征,例如,他们都将注意力集中在远景、商业用例和高层次的计划上。
Strengthening the top-level planning for nuclear security.
加强核安全顶层设计。
High-level planning must include key milestones, results deliverables, and critical success factors.
高水准的计划必须包括关键里程碑、交付成果以及至关重要的成功因素。
This often results in business needs being implemented through tactical it initiatives involving the procurement of specific systems rather than strategic enterprise-level planning.
这通常会导致业务需求通过涉及调配具体系统的战术IT活动实现,而非战略企业级的计划。
This paper analyzes the highway planning levels system, puts forward the three-level planning system containing the total demand, various grade demand and main highway construction project.
在公路网规划中对路网规划层次体系进行了研究,提出了公路网总规模、各级公路网规模及重点公路建设项目规划三层规划体系。
As a link between practical shop floor execution and MES reconfigurations, scheduling and even top level planning systems, task execution monitor and exception handling play an important role in MES.
监控和异常处理能够将车间实际运作与MES重构和调度乃至上层计划系统紧密联系起来,在MES中具有重要的地位。
As a link between practical shop floor execution and MES reconfigurations, scheduling and even top level planning systems, task execution monitor and exception handling play an important role in MES.
监控和异常处理能够将车间实际运作与MES重构和调度乃至上层计划系统紧密联系起来,在MES中具有重要的地位。