• Therefore, it is of great significance to study the routing characteristics of flood caused by levee breach.

    因此研究堤防溃决之后洪水在城区内演进规律具有重要的现实意义。

    youdao

  • The developed 2d model was then applied to describe possible flooding events due to levee breach in Harbin city. The results show that the model can simulate the levee-breach flood well.

    鉴于此,采用本文水流模型哈尔滨市可能发生洪水进行了数值模拟,模型比较合理的模拟了城区溃堤水流的运动,所得的结果合理可靠。

    youdao

  • The Mississippi River crested at Vicksburg yesterday at a record high of 14.1 feet above flood stage, but did not breach the main levee or inundate the city.

    昨天密西西比河洪水到达维克斯堡水位超出警戒水位14.1英尺但是没有损坏,也没有淹没整个城市。

    youdao

  • Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.

    哈尔滨上游蓄滞洪区的分洪能力以及可能发生最大洪水进行了计算和分析,得出结论认为哈尔滨市未来仍有发生溃堤的可能。

    youdao

  • Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.

    哈尔滨上游蓄滞洪区的分洪能力以及可能发生最大洪水进行了计算和分析,得出结论认为哈尔滨市未来仍有发生溃堤的可能。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定