The new dam consists of an earth core rockfill embankment and a concrete transition at the left abutment.
新建坝包括一座土质心墙堆石堤坝和一个位于左坝肩的混凝土过渡带。
The concrete face rockfill dam has been designed by the design institute at left abutment of Tongjiezi project to suit the unfavorable geologic conditions.
为适应铜街子工程左岸的不利地质条件,设计单位在左岸设计了砼面板堆石坝。
The concrete face rockfill dam has been designed by the design institute at left abutment of Tongjiezi project to suit the unfavorable geologic conditions.
为适应铜街子工程左岸的不利地质条件,设计单位在左岸设计了砼面板堆石坝。
应用推荐