Always having an attitude of improvement for products quality, safety, lead time, cost and efficiency.
具备对注塑制品品质,机台操作安全,交期,成本,效率优化意识。
As new project team leader, you need to lead and complete new projects into final production run on time, on cost budget and meeting quality requirements.
作为客户新项目的主要牵头人,需要准时、在预算范围内、高品质地完成客户的新项目的投产运行。
To reduce the cost and lead time of developing a trimming die, a method to obtain the trimming line in flange process is proposed on the basis of blank grid deformation.
为减少修边模的开发周期和成本,提出一种基于板料网格变形的修边线确定方法。
The essence of lean production is maximizing product value by means of reducing cost, waste and lead time.
精益生产通过降低成本、资源浪费和生产时间,最大化地增加产品的价值。
Lead a team of repairman, sub-lead, and operator to achieve the quality of products, which meet specified quality levels at the lowest cost within schedule time.
负责领导本部门员工在规定的时间内以最低的成本生产符合质量要求的产品。
One of the aims of concurrent engineering is to evaluate the manufacturability of product and procedure concurrently in order to short the lead time and reduce the cost of product.
并行工程的主要目标之一在于对产品和过程进行并行评价,以缩短产品上市时间和降低产品成本。
The supplier in the channel holds monopolistic status, in which he not only has relative cost information about the retailer, but also the decision-making right of the lead-time.
本文考虑一个含有一个供应商和一个零售商的整个供应链中,供应商在链中占据垄断地位,他不仅拥有零售商相关的成本信息,还有交货时间的决策权。
Cost or time pressure could lead to quality deficits.
成本或者交货期的压力可能导致质量低下。
It takes long time for cheese ripening, which lead to the increase of the manufacture cost.
干酪成熟时间较长且费用较高,干酪促熟成为降低生产成本的有效途径之一。
In the system, users can access up-to-date technical information of metal forming, and decrease lead time and cost of products, and enhance competitive power in market of products.
用户利用该系统可以及时地得到最新的锻压技术信息,缩短产品研制周期,降低成本,提高产品的市场竞争力。
Because the modern weapon system became more and more complexity, it will lead the fault detection and maintenance more difficult, such as the fault detecting time became long and the cost increases.
由于现代武器系统复杂化程度不断扩大,使得检测和维修难度增大,比如测试时间变长、维修保障费用增加。
The rationality of this method compared with traditional one is analyzed, and the significance of reducing the production cost and smoothing the logistics by shortening the lead time is emphasized.
与传统方法相比较,分析了该方法的合理性,强调了缩短过程周期时间对于产品成本降低和物流顺畅的意义。
According to the defects of the researches dealt with controllable lead time, the authors present a continuous review inventory model with nonlinear lead time crashing cost and lost sale.
针对可控提前期领域现有研究的不足,提出基于非线性提前期成本和存在顾客流失情形下,采用连续盘点策略的库存管理问题。
Due to reducing product life cycle and product cost, product design chain management has become more important for industries to develop innovative product within a shorter lead-time.
对产品设计链进行有效管理,可缩短产品上市时间,降低产品成本和提高产品质量。
Benefit: High Impact Resistance, Low Tooling Cost, Molding in One, Stable Size, Short Lead Time.
产品优点:高耐冲击,低模具成本,一体成型,尺寸精准,产品开发周期短。
This part studies two problems: transportation model of delivery stock cost and inventory model for unconfirmed lead time.
在此基础上重点研究了两个问题,即考虑在途库存成本的运输模型以及需求与前导时间不确定的存储模型。
Conduct dedicated Kaizen projects to reduce lead time and cost, improve productivity and quality under consideration of customer requests;
亲自带领并负责精益改善项目,如缩短交货期、节约成本等等;
On the other hand, they need to reduce production cost, shorten lead time, and lower inventory level to ensure profitability.
另一方面他们需要降低生产成本,缩短交货期和降低库存水平以确保盈利能力。
To initiate and drive cost down programs, improve quality, lead-time and capabilities etc to sustain profitable growth.
改进成本控制体系,提高产品质量、交货期、产能等,从而进一步提升公司的整体盈利能力。
Continuously strive to improve lead-time, cost and quality by market researching, qualifying new suppliers to improve our supply base efficiency.
通过进行供应商整合、开发新供应商、努力进行供应市场研究、探索,不断提高供应商的交货期、成本、质量。
Leads battery package design, technical standard and specification development to meet project needs in quality, cost, lead-time and capacity.
负责电池包装设计,确认技术标准和规格以满足项目在质量,成本,周期时间和生产能力上的要求。
Leads battery package design, technical standard and specification development to meet project needs in quality, cost, lead-time and capacity.
负责电池包装设计,确认技术标准和规格以满足项目在质量,成本,周期时间和生产能力上的要求。
应用推荐