The layout of turbine pipeline system in power station should be constructed as required in the drawing of design institute and the actual situation of power station.
水轮机管路系统在电站的布置,应按设计院图纸和电站的实际情况布置施工。
Aiming at layout of station signal design module which is the key aspect of system, paper presented a detailed design scheme.
针对系统中车站信号平面布置图设计模块这一关键环节,论文给出了详细设计方案。
Layout and design of metal structures for Vietnam Song Con 2 Hydropower Station are presented in this paper.
文章介绍越南昆江2水电站金属结构布置和设计成果。
This paper presents an analysis of the factors in layout of public areas associated with metro station and the key points for the design of the layout of public areas.
对影响地铁车站公共区布置因素进行了分析,介绍了公共区布置的设计要点。
This paper briefly describes the general layout and system design of preoperational test boilers of Daya Bay Nuclear Power Station and the economic benefits attained therefrom.
本文介绍了大亚湾核电站调试锅炉工程总体布置和系统设计以及实施效果。
This paper introduces in detail the overall design thought and concrete layout of the hydropower station of Baiyekou Reservoir.
详细介绍了柏叶口水库水电站的总体设计思想及具体布局。
The main topics such as the sewerage system selection, design principles, sewerage network layout, pumping station layout, design of pressure pipe and gravity pipe.
重点阐述在管网布置时,应考虑地形及地质情况,优选重力流排水以节能,并且要兼顾考虑泵站的设置数量及管网建设的经济合理性;
The layout and design of the bent structure of Powerhouse of Jilintai No. 1 Hydropower Station were expounded in this paper.
全面地介绍了新疆吉林台一级水电站工程主厂房排架的布置及设计情况。
The design process and the general layout of the rightbank underground power station of TGP and its construction opportunity are described.
介绍了三峡右岸地下电站设计过程、总体布置及兴建时机的研究。
Taking the bus company LNG/L-CNG filling station project as an example, the paper discusses the design ideas and key points of natural gas filling station on the general layout design.
文章以某公交公司的LNG/L-CNG加气站工程为例子,介绍天然气加气站在总图布置等方面的设计思路和要点。
Combining practice of some works, the paper probes a master plan design for LPG station with dispatch facilities for water transport from site selection to layout design.
结合工程实践,探讨含水路收发设施的LPG储配站从选址到站区平面布置的有关问题。
BY analyzing features of Ericssion "s new generation hardware BYB501, it discusses its effects on project design at the aspects of station setup plan, equipment configuration, plane layout and so on."
针对爱立信公司的新一代硬件BYB501设备的特点,从设局方案、设备配置、平面布置等方面讨论了它对工程设计的影响。
The narrow terrain at diversion tunnel inlet bring difficulty for layout design of construction cofferdam and dam pit of Shenxigou hydropower station.
由于深溪沟水电站导流洞进口地形狭窄,给导流洞进口施工围堰和大坝基坑的布置设计带来极大困难。
The narrow terrain at diversion tunnel inlet bring difficulty for layout design of construction cofferdam and dam pit of Shenxigou hydropower station.
由于深溪沟水电站导流洞进口地形狭窄,给导流洞进口施工围堰和大坝基坑的布置设计带来极大困难。
应用推荐