From 2005, data of railways were re-approved by Lanzhou Railway Bureau.
2005年起铁路数据由兰州铁路局重新核定划分。
To ensure that the north-west traffic artery - Baotou-Lanzhou railway access.
保证了西北交通大动脉——包兰铁路畅通无阻。
The Lanzhou Railway Administration is short of freight sourse and empty cars, and is draining on goods of high added value.
兰州铁路局货源不足,空车不足,高附加值货源流失严重,完成任务形势严峻。
Parts of the hardware and software system have been used on the Catenary Testing Car of LanZhou Railway Bureau, and the operation result is well.
所开发的部分软硬件在兰州铁路局接触网检测车上投入使用,运行良好。
Shapotou area, where the Baotou-Lanzhou Railway pass through is situated at the southeast edge of Tengger desert, belonging to steppe desert zone.
沙坡头地段位于腾格里沙漠东南缘,包兰铁路沿线,属草原化荒漠带。
The Lanzhou Railway Administration is short of freight sourse and empty cars, and is draining on goods of high added value. The situation is hard for accomplishing task.
兰州铁路局货源不足,空车不足,高附加值货源流失严重,完成任务形势严峻。
Upon completion, the railway will shorten the travel time of a passenger train between Lanzhou and Chongqing from 17.5 hours to 6.5 hours.
兰渝铁路将使兰州至重庆间的客车运行时间从现在的17.5小时缩减至6.5小时。
According to the scene measured data, the prediction of Lanzhou area railway noise has been carried out and this model rationality has been confirmed through the actual test.
根据现场实测数据,对兰州地区铁路噪声进行了预测,并且通过实际测试验证了该模型的合理性。
The analysis method of management software for self own vehicle of railway in Lanzhou Refinery was introduced during the process of demand analysis, database design and software design.
介绍兰州炼油厂铁路自备车计算机管理软件在需求分析、数据库设计和软件设计阶段所使用的分析方法。
As example is the second railway line built out from Lanzhou West to Wuwei South in the paper. The relationship is analyzed, and solving measure of concrete problem is discussed.
本文以兰州西至武威南铁路的增建二线工程为实例,分析了二者的相互作用和影响,探讨具体问题的解决措施。
A railway, connecting Lanzhou (Gansu's capital) and the Chongqing Municipality, is under construction.
一条连接甘肃省会兰州和重庆市的铁路正在修建之中。
The Lanzhou-Xinjiang Railway reached Urumqi at the end of 1962, bringing railway transport to the region for the first time.
1962年底兰新铁路铺轨到乌鲁木齐,结束了新疆没有铁路的历史;
F7 fault of Wushaoling tunnel, which lies in lanzhou-wuwei section of Lanxin railway line, is a large regional fault with high geostress.
兰新复线兰武段乌鞘岭隧道F 7断层,为区域性大断层,地应力高。
The third part discusses the logistic facts of the Lanzhou West Railway Station, with the emphasis on some problems existing in organizing the freight transport.
第三部分,介绍了兰州西车站物流工作现状,分析了目前货运组织工作中存在的问题。
The third part discusses the logistic facts of the Lanzhou West Railway Station, with the emphasis on some problems existing in organizing the freight transport.
第三部分,介绍了兰州西车站物流工作现状,分析了目前货运组织工作中存在的问题。
应用推荐