• On the concrete project design, first, we should enhance the measurement of labor cost controlling that is to control and reduce the employee quantity.

    具体方案设计上,是强化控制人工成本措施控制减少员工数量

    youdao

  • Abstract: With rising of the labor price, labor cost has become the key to determine and control the construction cost.

    摘要随着人工价格不断上涨,人工费用成为建设项目价格确定控制关键

    youdao

  • Control the allocated labor for each shift to ensure that customer expectations are met whilst achieving the desired labor cost.

    控制每个人员分配确保顾客期望得到满足达到预期的人员成本。

    youdao

  • To manage staffs insurances (those required by Labor Laws) and admin-related works with cost control and admin issues such as vehicles, etc.

    管理员工各种保险(按劳动法规定)各种行政工作控制成本公司各种行政事务例如车辆

    youdao

  • One of the effective ways of the cost control in tunnel construction is to minimize the waste of labor and material.

    隧道工程施工过程成本控制一个有效途径最大限度地减少工程施工中人工材料浪费

    youdao

  • Contributes toward profitability by seeking opportunities to increase sales, manage inventory and cost of goods control and labor costs.

    通过增加销售额、优化管理库存控制原料成本劳动力成本等措施,扩大盈利能力

    youdao

  • However, it focus on post-management, such as strengthening quality management and improving labor productivity, and is lack of control cost in design process.

    成本控制重点事后管理上,加强质量管理、提高劳动生产效率下游取得了很好的控制,但设计阶段成本控制不足

    youdao

  • Controls the manipulator using PLC to realize each kind of stipulation working procedure movement, may simplify the control line, saves the cost, enhances the labor productivity.

    应用PLC控制机械手实现各种规定工序动作可以简化控制线路节省成本提高劳动生产率

    youdao

  • They learn about everything from safety and labor relations to cost control and rework prevention.

    学习内容涵盖一切,如安全员工关系成本控制返工预防。

    youdao

  • So it is nessaccery to enhance the encouraging of compensation system; also, in order to control the cost of labor and risk-sharing, it should keep flexible as possible.

    此外,企业全球竞争中面临风险不确定程度越来越高,其希望灵活控制人工成本实现风险分担要求薪酬存在灵活性。

    youdao

  • For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.

    成本计划执行方面材料成本人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约

    youdao

  • With the increase of the labor cost in China and the change of the work mode in construction field, aerial work platform is more favored by the market due to its safety control.

    随着中国人工成本提高建筑工程操作方式转变更加安全高空作业平台产品受到市场青睐

    youdao

  • The machine comes with PLC control system, sensorfailure detecting, and can stop working automatically if the machine has any problem, it can greatly improve operation safety and reducing labor cost.

    杯过程PLC控制采用电眼全程故障监控,伺服供料,从而提高设备性能,达到快速平稳运行,实现了故障自动停机,最大的降低了工人劳动强度,提高了设备的安全稳定性。

    youdao

  • The machine comes with PLC control system, sensorfailure detecting, and can stop working automatically if the machine has any problem, it can greatly improve operation safety and reducing labor cost.

    杯过程PLC控制采用电眼全程故障监控,伺服供料,从而提高设备性能,达到快速平稳运行,实现了故障自动停机,最大的降低了工人劳动强度,提高了设备的安全稳定性。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定