On the concrete project design, first, we should enhance the measurement of labor cost controlling that is to control and reduce the employee quantity.
在具体的方案设计上,一是强化控制人工成本的措施,即控制和减少员工数量;
Abstract: With rising of the labor price, labor cost has become the key to determine and control the construction cost.
摘要:随着人工价格不断上涨,人工费用已成为建设项目价格确定与控制的关键。
Control the allocated labor for each shift to ensure that customer expectations are met whilst achieving the desired labor cost.
控制每个人员的分配以确保顾客的期望得到满足而达到预期的人员成本。
To manage staffs insurances (those required by Labor Laws) and admin-related works with cost control and admin issues such as vehicles, etc.
管理员工的各种保险(按劳动法规定)和各种行政工作并控制成本及公司各种行政事务例如车辆等。
One of the effective ways of the cost control in tunnel construction is to minimize the waste of labor and material.
隧道工程施工过程中,成本控制的一个有效途径是最大限度地减少工程施工中人工和材料的浪费。
Contributes toward profitability by seeking opportunities to increase sales, manage inventory and cost of goods control and labor costs.
通过增加销售额、优化管理库存、控制原料成本和劳动力成本等措施,扩大盈利能力。
However, it focus on post-management, such as strengthening quality management and improving labor productivity, and is lack of control cost in design process.
但成本控制重点在事后管理上,加强质量管理、提高劳动生产效率等下游取得了很好的控制,但设计阶段的成本控制不足。
Controls the manipulator using PLC to realize each kind of stipulation working procedure movement, may simplify the control line, saves the cost, enhances the labor productivity.
应用PLC控制机械手实现各种规定的工序动作,可以简化控制线路,节省成本,提高劳动生产率。
They learn about everything from safety and labor relations to cost control and rework prevention.
学习的内容涵盖一切,如安全,员工关系,成本控制和返工预防。
So it is nessaccery to enhance the encouraging of compensation system; also, in order to control the cost of labor and risk-sharing, it should keep flexible as possible.
此外,企业在全球竞争中面临的风险和不确定程度越来越高,其希望灵活地控制人工成本以实现风险分担,这就要求薪酬存在更大的灵活性。
For the implementation of the cost planning, the thesis explained how to conduct the project cost control from the material costs, labor costs, machinery costs, time costs and quality costs.
成本计划的执行方面,从材料成本、人工成本、机械成本、工期成本、质量成本几个主要方面讲述了如何进行项目成本制约。
With the increase of the labor cost in China and the change of the work mode in construction field, aerial work platform is more favored by the market due to its safety control.
随着中国人工成本的提高和建筑工程操作方式的转变,更加安全的高空作业平台产品受到市场青睐。
The machine comes with PLC control system, sensorfailure detecting, and can stop working automatically if the machine has any problem, it can greatly improve operation safety and reducing labor cost.
制杯过程PLC控制,采用光电眼全程故障监控,伺服供料,从而提高设备性能,达到快速平稳运行,实现了故障自动停机,最大的降低了工人劳动强度,提高了设备的安全稳定性。
The machine comes with PLC control system, sensorfailure detecting, and can stop working automatically if the machine has any problem, it can greatly improve operation safety and reducing labor cost.
制杯过程PLC控制,采用光电眼全程故障监控,伺服供料,从而提高设备性能,达到快速平稳运行,实现了故障自动停机,最大的降低了工人劳动强度,提高了设备的安全稳定性。
应用推荐