Then pass to check a great deal of data, establish to design the method and the step of the 110 kV transformer substation.
然后通过查阅大量资料,确立了设计110kV变电站的方法和步骤。
The tests of the grounding apparatus mounted at the transformer bushing tap and oil-filled paper condenser type bushing of 220 kV transformers in Shahe substation is presented.
对某电厂使用的变压器高压油浸纸电容式套管和环氧浸纸电容式套管的运行情况进行了比较,并对曾出现的故障类型进行了分析。
Transformer and distribution substation of 10 (6) KV for production equipments, circulating water field, area for tanks and other places.
生产装置、循环水场、罐区和其他场所的10 (6)KV变配电所。
Transformer and distribution substation of 10 (6) KV for production equipments, circulating water field, area for tanks and other places.
生产装置、循环水场、罐区和其他场所的10 (6)KV变配电所。
应用推荐