Key schedule is an important part in designing iterated block cryptosystems.
密钥编排是迭代型分组密码体制设计的一个重要环节。
A kind of randomness test on key schedule algorithm of block ciphers is designed.
计划了一种关于分组暗码密钥编排算法的随机性检测要领。
From the answers to the questionnaire, identify areas for further information requirements and schedule follow-up interviews with key personnel.
从问卷答案中,确定进一步的信息需求领域,并计划安排与重要人员的后续访谈。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
The key is to schedule things in moderation and choose activities with a child's age, temperament, interests, and abilities in mind.
按照孩子的年龄,性格,兴趣和思考能力来安排一些适量的事情及挑选活动是个关键点。
Step D. Schedule follow-up interviews with key client team members.
步骤D .计划安排与重要客户端团队成员的后续访谈。
A key meeting I conduct on all of my projects is an issue, risk, and detailed project schedule review meeting.
我曾针对自己的所有项目召开过一次很关键的会议,是关于问题、风险、项目进程明细表的回顾会议。
The final schedule is now online and features 103 speakers and 107 sessions on key topics designed for senior developers, team leads, architects in enterprise software development shops.
现在大家可以在线查看最终的议程,本次大会共有103位演讲人、107个主题,面向企业软件开发领域的高级开发者、团队领导及架构师。
But now that many bloggers have morphed into small-media business owners, they are starting to feel pressure to follow a schedule and cover key news stories.
但是,现在很多博客正逐渐转变为小型媒体,开始面临时间表和重大新闻报道的压力。
Setting a schedule and sticking to it is the key to saving for anything.
设置一个时间表,坚持是关键。
Similarly, assume that Mark accepts the proposed new time, but before he reschedules the meeting, he can click Check schedule to view the free times for all his key individuals (see figure 5).
与之类似,假设Mark接受了提议的新时间,但是在重新安排会议之前,他可以单击CheckSchedule查看所有关键参与者的空闲时间(见图5)。
This forum helps key members of the COE gain visibility as having the requisite knowledge and expertise to make the right choices for Acme. Here's an example schedule for such a forum.
该座谈会帮助COE的重要成员获得可见性,从而使他们具备为Acme做出正确决策所必备的知识和专业技术。
The vesting schedule of the program is designed in such a way to retain key talents.
该政策的解冻时间表是按照关键员工保留的目的设计的。
Manufacturing status is established during production meetings to identify key date activities based upon the production schedule.
生产会议将确定生产状态,根据生产进度时间表确立关键日活动。
The key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
The purpose of the schedule of expected key controls is to assist in the evaluation of the actual controls identified during the audit.
预计的关键控制表的目的是为了在审计过程中辅助评价实际存在的控制程序。
Main work contents and inspection work key point for next week, schedule drafting for group supervision next week.
下周主要工作内容及监理工作重点,拟订下周集体巡查计划。
Therefore, project Schedule Management is the key role in every project.
项目进度管理成了至关重要的环节。
It's hard to stay focused once the day gets started, so it is key to schedule a few minutes a day to just be quiet and focus on what needs to be done.
新的一天开始后,人们很难保持专注,所以,每天用几分钟时间让自己保持平静,专心思考需要完成的任务,便显得尤为关键。
Disengaging from a given activity is the key to living on schedule.
遵守日程安排来生活的关键是从一项活动中脱离。
Core data exchange area improves the presence of platform core data and also is the key to transaction schedule.
核心数据交换区技术增强了平台核心数据的表现形式,同时也是解决交易调度的关键。
The installation quality of the air-cooling island, which is a turn-key project of Shenmu Yangguang Power Plant, is very important, and its schedule control is also very complicated.
陕西神木阳光电厂工程空冷岛的安装质量控制主要是保证焊缝的施工质量和风机找平对中的质量,进度控制就是确保施工节点不变。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
工程施工进度风险分析计算是施工进度控制中的重要环节。
Thee key to JIT operations is that the demand for components and materials depends on the finalized production schedule.
准时制作业的关键是对配件和物料的需求根据最终生产进度来决定。
The key might not be to try to contort yourself into a schedule that doesn't work for you, but to experiment.
关键不是强行让自己适应不适合自己的作息时间表,而是去尝试。
Careers, like rockets, don't always take LFF on schedule. The key is to keep working on the engines.
事业就像火箭并非总是依时升空。关键是始终保持动力。
One of the key drivers of a successful airline is its network and schedule.
对一个成功的航空公司的主要动力之一是其网络和日程。
The cooperation schedule is a key part of the supply chain coordination.
合作进度是供应链协同的核心内容。
The cooperation schedule is a key part of the supply chain coordination.
合作进度是供应链协同的核心内容。