• The joint spacing of each set of joint is calculated and can be effectively fitted by negative exponential function.

    统计分析优势节理间距,得出各优势组节理间距符合负指数分布。

    youdao

  • A calculating formula of temperature stress for one floor reinforced concrete frame structures were presented by theory analysis, it contribute to calculating of the values of expansion joint spacing.

    单层框架例,通过理论分析计算框架结构温度应力有助于伸缩间距的计算。

    youdao

  • The theory value of the spacing and the time sealing of the later joint-filled slots and some proposals on the plane form are presented on the basis of numerical calculation.

    数值计算基础上提出带的留置间距封闭时间理论值,并对后浇带的平面形状提出应注意的问题。

    youdao

  • The sand retention apparatus is composed of an upper joint (1), a central tube (2), a retention ring (3), a sealing element (4), a spacing ring (5), an adjusting ring (6) and a bell mouth (7).

    此种接头(1)、中心(2)、挡(3)、密封件(4)、环(5)、调节环(6)喇叭口(7)组成。

    youdao

  • The sand retention apparatus is composed of an upper joint (1), a central tube (2), a retention ring (3), a sealing element (4), a spacing ring (5), an adjusting ring (6) and a bell mouth (7).

    此种接头(1)、中心(2)、挡(3)、密封件(4)、环(5)、调节环(6)喇叭口(7)组成。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定