The contractor shall retighten the nuts one week after joint installation and a second time just before final lining and leveling of the track.
承包商应于接头安装后一周重新拧紧螺母,并就在轨道最终衬砌和整平前再一次拧紧。
The contractor shall retighten the nuts one week after joint installation and a second time just before final lining and leveling of the track.
承包商应于接头安装后一周重新拧紧螺母,并就在轨道最终衬砌和整平前再一次拧紧。
应用推荐