For the case of safety, its construction will adopt pipe-roof culvert box jacking method.
为慎重起见,拟采用管幕保护下的顶进法施工。
Pipe jacking method could be used to solve the difficulties setting pipeline in bumper-to-bumper traffic area.
对公厕和菜场等公共排水区域,采用增设格栅井的方法以解决这些特殊区域污水收集管道易堵塞等难题。
Skeleton frame bridge jacking method is a frequently adopted practice in the construction of existing railway lines.
框架桥顶进在既有线施工中是较常见的一种施工方式,已经在铁路工程施工中广泛应用。
With a practical project, authors state application status of the pipe jacking method in construction of contact tunnels of a subway shield zone tunnel.
从工程实例出发介绍顶管法在地铁盾构区间隧道联络通道施工中的应用情况。
Guang zhau the Undergroumd 2nd Line will pass through Hua nan Express Way. During construction communication of the express way should not be cut off. Pipe jacking method is suggested.
广州地铁二号线要穿越华南路,华南路是一条高速公路,施工时地面交通不能中断,本文建议采用顶管法穿越。
With the finite element software, the influence on the structure is calculated of metro excavation under large span obliquely intersected framed underpass bridge constructed with jacking method.
借助大型有限元分析软件,对大跨度斜交顶进框架式地道桥底板下开挖地铁对地道桥结构的影响进行较深入的探讨。
The construction plan, process flow, construction method, pre control of jacking quality and matters need attention are elaborated in detail.
并对其施工方案、工艺流程、施工方法、顶进质量的预控和安全注意事项作了详细的阐述。
Abstract: the framework of existing in jacking bridge before construction, according to the actual situation of construction site make feasible construction method.
摘要:既有线框架桥顶进施工前,要根据施工现场实际情况制定切实可行的施工方法。
By making use of the semi analytical element method, the three dimensional soil movements problem of pipe jacking is transfered to a one dimensional numerical calculation.
利用半解析单元法将顶管施工中三维土运动问题转化成一维数值计算。
This paper introduces the construction program and practicing method of the foundation underpinning and column foundation jacking restoration.
本文介绍了采用基础托换与柱基顶升复位施工的程序和做法。
At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
Combined with the construction sequences of the drift and pile method, the idea of zoning, phasing, grouping, and staging is adopted to design the overall jacking scheme.
结合洞桩法施工工序,按“分区、分阶段、分组、分级”原则,制定总体顶升方案。
As a new technology, the reducing friction through method placing mortar has is more and more popular in the Pipe Jacking project.
注浆减摩作为一门新技术,在顶管工程中应用越来越普及。
The mechanism of soil disturbance due to pipe jacking is investigated, and an improved method proposed to divide the sections of soil disturbance based on the results of former researchers.
在前人的基础上,研究了顶管施工引起土体扰动的机理,提出了更加准确的土体扰动分区图。
The mechanism of soil disturbance due to pipe jacking is investigated, and an improved method proposed to divide the sections of soil disturbance based on the results of former researchers.
在前人的基础上,研究了顶管施工引起土体扰动的机理,提出了更加准确的土体扰动分区图。