• It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.

    分析表明,水平平行施工由于中间区域受到双重扰动,会产生较大地面沉降

    youdao

  • It shows that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.

    研究结果表明,水平平行施工中间区域受到双重扰动,产生地面沉降较大。

    youdao

  • In construction of pipe jacking, the wall of working shaft and soil body behind the sidewall offers enormous supporting force to a lift.

    施工中,千斤顶支座需要巨大的反力支持这些反力是工作的侧壁以及壁土体提供的。

    youdao

  • Glass fibre reinforced plastic mortar pipe(Centrifugal casting process)is introduced to be as jacking pipe material used in the design and construction of one jack engineering project.

    玻璃纤维增强塑料夹砂离心浇铸工艺作为管管材运用于顶管工程中的设计施工介绍

    youdao

  • The construction of Pipe Jacking is beset with difficulty due to the large propulsive force for several years.

    口径长距离施工顶进推力过大困扰顶管施工多年的技术难题

    youdao

  • For the case of safety, its construction will adopt pipe-roof culvert box jacking method.

    慎重起见,拟采用管幕保护下进法施工

    youdao

  • This paper introduces the epicyclic reduction arrangement applied in cutting drive mechanism in pipe jacking, analyses the construction and characteristics of epicyclic reduction arrangement.

    介绍掘进机截传动装置采用的行星齿轮减速器,论述行星齿轮减速器结构特点

    youdao

  • According to an engineering case, the paper introduces the design and key points of construction of pipe-jacking techniques.

    文中结合实际工程介绍了人工挖土顶管方法设计施工关键施工技术要点

    youdao

  • With a practical project, authors state application status of the pipe jacking method in construction of contact tunnels of a subway shield zone tunnel.

    工程实例出发介绍顶地铁盾构区间隧道联络通道施工中的应用情况

    youdao

  • At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.

    目前直径泥水平衡顶掘进已成为城市给排水水管、电力管线工程首选施工方法

    youdao

  • Pipe jacking construction disturbs soil inevitably, which would results in soil deformation and does harm to its surroundings.

    施工土体扰动不可避免的,土体变形是土体受扰动的结果土体变形则对周围环境造成危害。

    youdao

  • Finally, several control measures are proposed to avoid failure for long-distance linear and curvilinear pipe jacking construction.

    提出了长距离直线曲线施工防止管道失稳控制措施

    youdao

  • The deformation of ground surface during the construction of curved pipe-jacking is studied with 3d finite element methods.

    通过建立维有限元模型,研究了曲线施工过程地表变形规律。

    youdao

  • As is shown in analytical calculation, ground deformation induced by pipe jacking construction is three-dimensional and changing with the jacking-in of shield.

    分析表明施工引起地面产生三维变形随着掘进机的顶进而不断产生变化

    youdao

  • Guang zhau the Undergroumd 2nd Line will pass through Hua nan Express Way. During construction communication of the express way should not be cut off. Pipe jacking method is suggested.

    广州地铁二号线要穿越华南,华南路一条高速公路施工时地面交通不能中断,本文建议采用顶穿越。

    youdao

  • Guang zhau the Undergroumd 2nd Line will pass through Hua nan Express Way. During construction communication of the express way should not be cut off. Pipe jacking method is suggested.

    广州地铁二号线要穿越华南,华南路一条高速公路施工时地面交通不能中断,本文建议采用顶穿越。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定