Abstract: the framework of existing in jacking bridge before construction, according to the actual situation of construction site make feasible construction method.
摘要:既有线框架桥顶进施工前,要根据施工现场实际情况制定切实可行的施工方法。
The construction plan, process flow, construction method, pre control of jacking quality and matters need attention are elaborated in detail.
并对其施工方案、工艺流程、施工方法、顶进质量的预控和安全注意事项作了详细的阐述。
With a practical project, authors state application status of the pipe jacking method in construction of contact tunnels of a subway shield zone tunnel.
从工程实例出发介绍顶管法在地铁盾构区间隧道联络通道施工中的应用情况。
At present the large diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.
目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。
Skeleton frame bridge jacking method is a frequently adopted practice in the construction of existing railway lines.
框架桥顶进在既有线施工中是较常见的一种施工方式,已经在铁路工程施工中广泛应用。
As a new technology, the reducing friction through method placing mortar has is more and more popular in the Pipe Jacking project.
注浆减摩作为一门新技术,在顶管工程中应用越来越普及。
Pipe jacking method could be used to solve the difficulties setting pipeline in bumper-to-bumper traffic area.
对公厕和菜场等公共排水区域,采用增设格栅井的方法以解决这些特殊区域污水收集管道易堵塞等难题。
Pipe jacking method could be used to solve the difficulties setting pipeline in bumper-to-bumper traffic area.
对公厕和菜场等公共排水区域,采用增设格栅井的方法以解决这些特殊区域污水收集管道易堵塞等难题。