The improved arithmetic enhances astringency and astringent rate of the simulation with saturated accuracy, reduces the iteration time obviously.
改进的算法在保证精度的同时使模拟的收敛性和收敛速度都有较大的提高,显著缩短了迭代时间。
The calculations and the experiments show that the convergence property and the iteration time of the method are excellent, and the method is available in the ECM.
计算和实验结果表明,阴极边界调整法收敛性较好,迭代次数适当,能满足设计要求。
Taking use case view as an example, sequence diagrams were built up through the analyzing noun and verb of edit model, designing object and class, and iteration time after t…
以用例视图为例,通过分析编辑模型的名词和动词,设计对象和类,经数次迭代后建立其顺序图。
Taking use case view as an example, sequence diagrams were built up through the analyzing noun and verb of edit model, designing object and class, and iteration time after time.
以用例视图为例,通过分析编辑模型的名词和动词,设计对象和类,经数次迭代后建立其顺序图。
In this strategy, people accept that their team members will have idle time during each iteration.
在此策略中,人们接受他们的团队成员将在每次迭代中有空闲时间。
At the end of an iteration of work, we always look back at how we did and figure out what we can do differently next time to improve.
持续的反馈和改进:在重复工作的结束时,我们总是回顾我们是如何做的,并找出下次改进时我们可以做的不同之处。
If we determined there was not enough time in an Elaboration or Construction iteration to complete our work, we would push the work out to the next iteration.
如果我们认为在一个精化或构建迭代阶段没有足够的时间完成我们的工作,我们将把这项工作推延到下一个迭代中去。
If you work on only a single iteration at a time, this is not an issue.
如果您一次只工作在一个迭代上的话,就不存在这个问题了。
Is the team working on more than one iteration at a time?
团队是否会在某些时候对多于一次的迭代进行工作?
We define an iteration as a phase, a milestone, or a period of time.
我们将一次迭代定义为一个阶段,一个里程碑,或者一个时间段。
This will only happen on the first iteration of the loop, saving valuable execution time on each subsequent iteration.
这样,它只在循环第一个迭代时执行,从而在以后每次迭代时节省了宝贵的时间。
If the test application enhancements were extensive, those enhancements were developed on a previous iteration to allow time for development of the test application.
如果测试应用程序增强是大规模的,那么就在先前的迭代中开发那些增强,从而给测试应用程序的开发留出时间。
In one iteration, this usually takes little time, so the system resources are claimed for only a short period.
这在一次的迭代中占有很少时间,所以只是短时间占用系统资源。
The timelines of testing within the iteration determine if sufficient time is available for test automation at all.
在迭代中测试的时限决定是否有充足的时间用于测试自动化。
Figure 2: in this case, Project 2's team did not spend time developing tests as they implemented the code, but spent time at the end of the iteration writing tests.
图2:在这种情况下,项目2的团队在执行编码时并没有花时间来开发测试,但是在迭代结束时花了时间来编写测试。
People will be busy throughout the iteration, but will not be working on the same functionality set at the same time.
人们将在整个迭代中都十分忙碌,但不能在同一时间处理同一功能集合。
Break the other functionality into groups and use iteration to release it to your users over time.
将其他功能分成组,并随着时间的流逝采用迭代方法向用户发布。
Over time—and by taking time to inspect, experiment, and build skills and confidence one iteration at a time—they learned how to navigate the sort of "normal " conflicts that come up on every team.
他们在每个迭代中都进行检视、实验,并构建解决冲突的技能和信心。 随着时间推移,他们学会了如何处理每个团队都会发生的“平常的”冲突。
The first iteration of the process does not have to be the ideal process; you can begin with the easier parts, and expand with each iteration over time to improve the process.
第一次流程迭代并不会产生理想的效果;您可以从比较简单的部分入手,然后在每次迭代中进行扩展,从而改善整个流程。
However, since each iteration USES the same number of registers, you can simply calculate the register number at assembly time.
然而,由于每次迭代都使用了相同编号的寄存器,因此您可以简单地在汇编时计算寄存器的编号。
This interval defines the duration of an Iteration which is time boxed.
这种间隔定义了定时迭代的持续时间。
The rule used for representing the learning curve effect states that the more times a task has been performed, the less time will be required on each subsequent iteration.
表示学习曲线效应的规则是做一个任务的次数越多,每次重复所需的时间越少。
Demos should be a time to celebrate the successes of the iteration and acknowledge the work of your peers.
演示是庆祝迭代成功和认可你同事们工作的好时机。
Note that at the time of this writing, the final system test iteration has not yet been entered.
注意写到此时,最终的系统测试迭代还没有开始。
Scheduling is basically a time box method that defines the period of time for an iteration and the requirements that should be completed within that time frame.
计划调度基本上就是一个时间框方法,定义应该完成的交互和需求的时间范围。
Once development activities are at a stable state (when each iteration in the build-test continuum has been completed), it's time to deploy the implementation.
开发活动处于稳定状态后(构建-测试连续体中的每个迭代均已完成),就要对实现进行部署了。
A great view into this is the iteration plan view called "Planned Time." to get there.
对此有一个很有用的视图就是叫做“PlannedTime”的迭代计划视图。
Major RUP milestones, most of which, most of the time exist within a single iteration, are.
大部分主要的RUP里程碑大部分时间都存在于单个的迭代中,它们是。
We can calculate all Ted’s assignments and spent time and define estimate accuracy for next iteration, let’s say it is 0.7.
我们可以计算Ted的全部任务分配和花费时间,并计算出下个迭代的估算准确率,假定为0.7。
Allocate stories of varying sizes to the first iteration one at a time and let the team determine how many of them they think they could get done in the time available for this iteration.
一次一个地把各种大小的故事分配至第一次迭代中,让团队决定他们认为自己能在这次迭代内完成多少故事。
应用推荐