In the design process, the controllability is the interchange process of simulation and design.
设计过程的可控性表现在模拟和设计的相互交换过程中。
XML validation is important because you want to catch errors as early as possible in the information interchange process.
XML验证非常重要,因为我们想要尽快捕获信息交换过程中的错误。
There is a constant subconscious interchange of information between all these layers of the whole self, and this is an extremely important process.
在所有这些全我在不同层面的分身之间有一个常定的潜意识在交换信息,这也是这个过程中最重要的一点。
This profile provides interchange semantics between business process models and existing or new UML2 models.
此概要可在业务流程模型与现有或新增的UML2模型之间提供互换语义。
This means that BPMN process models will have a standard representation for exchange between modelling tools based on XMI (XML for Model Interchange).
这意味着BPMN过程模型会有一个标准表示,以便在基于XMI(模型交换XML)的建模工具间的交换模型。
If event sequencing is required, make sure that event IDs are supplied that allow InterChange Server to process events in parallel as appropriate.
如果事件顺序是必需的,请确保将提供事件ID,以允许InterChangeServer以适当的方式并行处理事件。
Figure 1 shows a scenario in the InterChange Server process designer.
图1显示的是InterChangeServer过程设计器中的一个场景。
Import the project interchange file with the prepared business process as follows.
使用准备好的业务流程按如下方式导入项目交换文件。
This time, change the Project Interchange Name so you will know this is the updated version of the process model.
这次,更改projectInterchangeName,以便您知道这是该流程模型的更新版本。
The business process should validate the electronic data interchange (EDI) requests and send the status of the claim back to the provider.
该业务流程应该验证电子数据交换(electronic data interchange,EDI)请求,并向提供者发回索赔状态。
BPMN 2.0 introduces XMI-based and XSD-based interchange formats for BPMN models which we expect will be used in the future to interchange both BPMN 1.1 and BPMN 2.0 process definitions.
BPMN 2.0为BPMN模型引入了基于XMI和XSD的交换格式,我们希望未来它对BPMN 1.1和BPMN 2.0的流程定义都适用。
For example, Interchange Server included business object mapping, which exists in Process Server in the form of interface maps.
例如,InterchangeServer包括了业务对象映射,该对象映射以接口映射形式存在于Process Server中。
It should be noted that the primary focus of WebSphere InterChange Server is to provide solutions for the Process Services requirements.
值得注意的是,WebSphereInterChangeServer的主要目的是为流程服务需求提供解决方案。
Subsequent articles will explore new enhancements for the other artifacts generated in WebSphere Process Server V7.0 after migrating your InterChange Server repository.
后续文章将探讨迁移InterChangeServer存储库后websphereProcess ServerV7.0中生成的其他工件的新增强。
Note that you will also need to deploy the two applications provided in the accompanying Project Interchange file to your WebSphere Process Server instance.
注意,您需要将附带的ProjectInterchange文件中提供的两个应用程序部署到您的WebSphereProcessServer实例。
This article only shows the steps to add correlation set and event handler. You need to import the draft project interchange file with the prepared business process using the following steps.
本文只展示添加相关集和事件处理程序的步骤。
Because of this process, there has been a considerable reduction in paperwork through use of Electronic Data Interchange.
由于这一过程中,有一个相当大的减少文书工作,通过使用电子数据交换。
Plasticizer DOTP was prepared from ethylene glycol residue (major component is PET low polymer) using single step process in which alcoholysis and ester interchange were combined.
以聚酯生产中产生的下脚料——乙二醇残渣(主要含PET低聚物)为原料,采用辛醇合并醇解、酯交换一步法工艺,合成了增塑剂DOTP。
The construction is systems engineering with multi-type, multi-process, interchange and continuous operation.
建筑施工是一个多工种、多工序、立体交叉、连续作业的系统工程。
The construction is systems engineering with multi-type, multi-process, interchange and continuous operation.
建筑施工是一个多工种、多工序、立体交叉、连续作业的系统工程。
应用推荐