The answer: integration testing.
答案是:集成测试。
This chapter moves into integration testing.
本章转到了集成测试。
The other kind of testing is integration testing.
另外一种测试就是集成测试。
Use ongoing system and component integration testing
有正在进行的系统和部件的集成测试
more platform integration testing (Tomcat, Geronimo etc.)
更多的平台集成测试(Tomcat,Geronimo等等)
Improvements in Spring's unique integration testing support.
对Spring特有的集成测试支持的改善。
If integration testing is not included in Done, when will you integration test?
如果集成测试没有包含在“完成”中,那什么时候进行集成测试呢?
The remainder of your integration testing depends upon your particular environment.
集成测试的其余部分取决于特定环境。
This is a good example of when unit testing can really outperform system integration testing.
这是单元测试能够胜过系统集成测试的一个很好的例子。
Anti-pattern: Postpone integration testing until all code has been completed and unit-tested.
反模式:推迟集成测试直到所有代码都完成并且单元测试也已完成。
RUP's testing recommendations comprise unit testing, integration testing, system testing, and pilot testing.
RUP的测试建议由单元测试、整合测试、系统测试和试点测试组成。
Test engineers can use it to catch memory errors during functional verification and system integration testing.
测试工程师可以利用它获取功能验证和系统整合测试期间的存储错误。
RUP acknowledges four levels of testing: unit testing, integration testing, system testing, and acceptance testing.
RUP确定了四级测试:单元测试、集成测试、系统测试和验收测试。
The integration testing phase aims to ensure that the software is ready for running beta tests with the final users.
集成测试阶段的目标,是确保软件已经为最终用户运行贝塔测试做好准备。
But transforming the SOAPAction header is usually forgotten, which leads to problems later during integration testing.
但是SOAPAction报头的转换往往被忽略,这会导致后来在集成测试中出现问题。
Integration testing - Support for integration testing is included, to ease testing of functionality such as data access.
集成测试——支持集成测试以简化数据访问等操作。
This approach was utilized for non-functional items as well, such as code re-factoring and automated integration testing.
这种方法也适用于非功能性项目,例如代码重构和自动化整合测试。
Also, Spring test module has great support for unit and integration testing of Jpa classes (for example AbstractJpaTests).
同样,SpringTest模块对JPA类(如abstractjpatests)的单元测试、集成测试都提供很好的支持。
In that case, you should test each component in isolation first before combining components to perform integration testing.
在这种情况下,应该首先单独测试各个组件,然后将组件组合在一起执行综合测试。
This article shows how some of the advantages of integrated environments come into play in functional and integration testing.
本文将展示集成环境在功能测试和集成测试中的优势。
Performing integration testing on code supplied from multiple sources is quite different from testing code from a single source.
对多来源的代码进行集成测试与对单来源的代码进行集成测试是很不同的。
To drive integration testing earlier in the life cycle, the testing sequence should be organized by iteration rather than by component.
为了在生存周期中提早进行集成测试,测试序列应该由迭代过程来组织,而不是根据部件来组织。
During integration testing in the software development life cycle, individual software components are combined and then tested as a group.
在软件开发生命周期的集成测试期间,单个软件构件会得到合并,并作为一个组进行测试。
The process looks for completion of a unit test report generated by the SOA tester and then initiates a request for service integration testing.
该流程等待SOA测试人员完成单元测试报告的生成,然后发起服务集成测试请求。
Even if a development team does not practice test-driven development, having programmatic tests exercise UI code is valuable for regression and integration testing.
即使一个开发团队没有在使用测试驱动开发方式,拥有一个可编程的能测试实际UI代码的框架,对于回归和集成测试也是很有价值的。
The integration testing phase occurs after the development phase, when individual software components have already been unit tested, and before customer acceptance testing.
集成测试阶段会在开发阶段之后开始,此时单个软件构件已经进行单元测试了,而这发生在客户接受测试之前。
The contractor will provide development, integration testing, procurement and delivery of the Low Band Universal Communications System Program Transmit Terminal Equipment (TTE).
SAIC公司将为海军提供低波段通用通信系统程序传输终端设备(TTE)的开发、集成测试、采购和交付等服务。
In the sections that follow, I'll continue to walk you through a Ruby on Rails example, focusing this time on functional testing and the new Rails integration testing framework.
在后面的小节中,我将继续使用RubyonRails示例,这次的重点放在功能测试和新的Rails集成测试框架上。
IBM's Lotus Software Support Web site is an excellent source of information for known issues and workarounds and is worth your time to research when preparing for integration testing.
对于已知问题和解决方案,IBM的LotusSoft wareSupportWeb站点是极好的信息源,在为集成测试作准备时,对该站点的内容花些时间研究是值得的。
A second major risk area is not validating assumptions early in the development process (which may prove to be invalid when the system is in integration testing, leading to significant rework).
第二大的风险区域就是在开发过程中的早期不去确定假定条件(这可能在系统进行集成测试时被证明是无效的,导致重大的返工)。
应用推荐