It's critical that we finishwell on the EFT-1 work so that we have a successful test flight and keepmomentum on our EM-1 design work, program to program efforts and European SpaceAgency integration.
这是至关重要的,我们完成好在EFT-1工作,使我们有一个成功的测试飞行,并保持势头EM-1的设计工作,计划,计划的努力和欧洲航天局的整合。
The integration test for static parameter was completed by control software as well as event-driven, callback functions and interactive program.
测控软件以事件驱动、回调函数与交互式程序,完成静态参数综合测试。
The integration test for static parameter was completed by control software as well as event-driven, callback functions and interactive program.
测控软件以事件驱动、回调函数与交互式程序,完成静态参数综合测试。
应用推荐