The developer can also generate data for unit test and can schedule the changes to be integrated into the nightly builds.
开发者还可以生成单元测试所需数据,将变更集成到每夜构建中。
The integrated project plan ensures that dependencies between groups are managed and the project remains on schedule and within budget.
集成项目计划则确保团队之间的相互依赖在可管理的范围内,项目能够按日程表的进度进行以及不超出预算。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
We provide a fully integrated solution that takes account of message, budget, schedule, safety and environmental impact.
我们提供一个完全集成的解决方案,并且把要旨,预算,进度,安全和环境都加以考虑。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
The Application Form, Quotation, policy wording, Schedule, any endorsement attached hereto or marked thereon and any other written agreement shall form integrated parts of this Policy.
投保单、报价单、保险条款、保险单、批单或批注及其它约定书均为保险合同的构成部分。
This Application form and Quotation (if any), policy wording, Schedule, any endorsement attached hereto or marked thereon (if any) and any other written agreement shall form integrated parts of this.
本投保单与报价单(如有)、保险条款、保险单、批单或批注(如有)及其它约定书均为保险合同的构成部分。
With careful monitoring, considering the accordance of the construction schedule and the loading speed, the reclaiming process is integrated with the treatment of soft soil in this case.
该工程的特点是在严密的监测下,吹填进度和加荷速度一并考虑,围海造陆过程与软基处理过程融为一体。
This paper also analyzes and studies the factors of Master Production Schedule (MPS) and capacity planning, which are integrated with the market trend of Semiconductor industry.
本文结合行业的市场形势,对影响主生产计划(MPS)的因素和产能规划进行了分析研究。
It is an integrated model that optimizes seat inventory allocation and train departure schedule to maximize the overall operational revenue.
模型以列车运营总收益最大化为目标,优化列车的席位控制和发车间隔,将席位分配与运营能力优化统一在一个模型中。
When accepted by Customer, such time schedule and assessment plan shall form an integrated part of this Agreement.
一旦由客户正式授权签字确认,这份时间表和评审计划将成为本协议的一部分。
When accepted by Customer, such time schedule and assessment plan shall form an integrated part of this Agreement.
一旦由客户正式授权签字确认,这份时间表和评审计划将成为本协议的一部分。
应用推荐