This process results in a project management plan that is updated and revised through the Integrated Change Control process.
这一过程的结果使项目管理计划通过整体变更控制过程得以更新与修改。
All changes to the project management plan flow through the change management process and integrated change control.
所有关于项目管理计划的变更遵守变更管理流程并置于变更控制之下。
Optimization Of shift plan is an important problem in the Freight Classification Computer Integrated Process System (CIPS).
在铁路货运编组站计算机集成过程系统(CIPS)的设计中,班计划决策优化是一个很重要的问题。
The integrated design and construction team had to plan ahead, workshop collectively and cooperate in ways that were unconventional to the normal design and construction process.
整体设计建造团队必须提前计划,共同工作,以某些方式进行合作,这些方式对于标准的设计建造过程来说是不合常规的。
The integrated design and construction team had to plan ahead, workshop collectively and cooperate in ways that were unconventional to the normal design and construction process.
整体设计建造团队必须提前计划,共同工作,以某些方式进行合作,这些方式对于标准的设计建造过程来说是不合常规的。
应用推荐