Instrument installation detail drawings shall reflect taps in accordance with these notes.
仪表安装详图应根据上述注解反映取压口的方位。
Manage and supervise the instrument installation contractor and in accordance with the contract scope specifications standards and construction drawings.
管理和监督设备安装承包方的工作,并确保其符合承包合同规定的范围,规格,标准和建筑制图。
Main Achievements: Mother liquor during the water treatment project in the field of instrument installation, PLC programming, commissioning PC (Siemens S7-300 + configuration king).
主要工作业绩:期间参与母液水处理项目的现场仪表安装、PLC编程、上位机调试(西门子s7- 300 +组态王)。
Support the procurement, installation, commissioning and validation of new instrument and laboratory Capex project.
参与新仪器的采购,安装,调试,验证,及实验室建设项目。
This chapter gives an overview of the precautions concerned with the installation places and the instrument connection. You are suggested to read this chapter before applying the instrument.
本章节介绍关于安装位置和仪器连接的注意事项,建议使用本机前阅读本章节内容。
The technical comparison shows that the laser centering instrument is superior to conventional centering methods in the installation and adjustment of equipments.
通过技术比较,证明激光对中仪用于设备的安装调试具有传统对中方法难以比拟的优势。
Simple installation in the middle of the instrument panel.
简单地安装在工具面板中央。
In addition, attention shall also been paid to installation and commissioning of correlative automated instrument.
此外,对相关自动化仪表的安装和调试也应非常关注、细心。
Some course topics may include: instrument calibration. design and installation testing. system safety and maintenance procedures. procurement and installation procedures. and report preparation.
主要课程包括:仪器校准、设计和安装测试、系统安全与维护、采购和安装程序以及报告的编写。
This paper introduces the working principles and characters of microwave level instrument, gives its selective principles and some votes in installation.
本文介绍了微波物位仪的工作原理及特点,给出了选用原则,安装注意事项。
According to the performance of the liquid hydrocarbon farm, its key point of the automation design in aspect of control scheme instrument selection, configuration and installation are described.
针对液态烃罐区的特点,从控制方案、仪表选型、组态、安装等方面来阐述液态烃罐区自动化设计的要点。
The total price includes installation, commissioning of the analytical instrument and a basic training of its operation.
合同总价包括安装调试,安装现场培训,设备移交用户。
This paper introduces some methods of lectotype and installation of instrument so as to decrease energy consumption of instrument, and give some engineering samples.
本文结合工程实例,介绍如何通过仪表选型、安装来降低仪表伴热能耗的问题。
Mainly expound the applications, working theory, installation, debugging and some problems which are likely to appear of this instrument.
主要阐述了该监测仪的应用状况、工作原理、安装调试以及可能出现的一些问题。
Test instrument point: Have fixed exactly installation position of ventilation and performance test including related drawings.
试验测点:已完成通风试验和性能试验测点安装位置及加工图纸。
The instrument introduced in the magnetostrictive technology has high measuring accuracy, low cost, long life and easy installation etc.
该仪表采用磁致伸缩技术,具有测量精度高、成本低、寿命长和安装简便等特点。
Wrong installation or use will cause the instrument damage or personal injury.
错误的安装或使用会导致仪表损坏或人身伤害德语翻译。
The design, integration and installation of the automatic and electronic controlling-system, automatic intelligent instrument controlling system and high and low pressure matching-electronic system;
自动化电气控制系统、自动化智能仪表控制系统、高低压配电系统的设计、集成、安装;
This type of voltage transformer is an outdoor installation for metering of electric energy, also called electric metering box after equipped with the instrument box for electric energy metering.
本型互感器为户外电能计量装置。与电能计量仪表箱配置后又称为电力计量箱。
Installation dimensions: compliance with Cummins random instrument box installation requirements.
安装尺寸:符合康明斯随机仪表箱安装要求。
Finally, it analyzes the structure design and installation method of the measuring instrument and the testing way and result of the measuring instrument.
然后文章还介绍了测量仪的串口通信方式和通信协议以及实现的方法。
Attend the installation and commission of instrument during the capital construction and production preparation phase to ensure smooth start-up of plant.
在基建施工和生产准备阶段,参与机械设备安装、试,确保装置顺利开车投产。
Care must be exercised during installation and wiring of this unit to ensure that no connections are made from phases other than the one being used to power the instrument.
在安装和配线的过程中一定要小心,不要将单相电源与设备总电源相联接。
Interior and installation with adhesive, lamp with adhesive, instrument panel with adhesive products, Jushi, round arc, fender, logo, with the doorknob protection adhesive products.
内饰及安装用背胶产品,车灯用背胶,仪表盘用背胶产品,车饰条,轮弧,挡泥板,车标,门把保护用背胶产品。
TC3300 optical fiber Identifier is an essential instrument for the installation and maintenance of optical fiber projects. It can easily detect any spot of SM fiber cables.
TC 3300光纤识别仪是一种光纤维护必备的工具,用于无损的光纤识别工作,可在单模的光纤的任何位置进行探测。
The principle of eliminating installation errors about measuring from two sides is proposed. By this method, the instrument can be enhanced measurement accuracy.
针对仪器安置误差不易确定的缺点,提出了采用双向拉测法消除安置误差的原理,提高了测试精度。
The principle of eliminating installation errors about measuring from two sides is proposed. By this method, the instrument can be enhanced measurement accuracy.
针对仪器安置误差不易确定的缺点,提出了采用双向拉测法消除安置误差的原理,提高了测试精度。
应用推荐