This process simplifies greatly the traditional submarine foundation construction procedures, increases generally the installation rate 20 times, and cuts down the engineering cost by more than 30%.
这一过程,大大简化了传统的水下基础施工程序,一般可提高安装速度20倍,节省工程费用30%以上。
This process simplifies greatly the traditional submarine foundation construction procedures, increases generally the installation rate 20 times, and cuts down the engineering cost by more than 30%.
这一过程,大大简化了传统的水下基础施工程序,一般可提高安装速度20倍,节省工程费用30%以上。
应用推荐