The results indicated that water loss and the total cost of water leakage control decreased because of the optimal inspection interval.
结果显示,总漏水量因实施优化检测周期而减少,漏损控制费用降低。
Periodic inspection, each one minute interval check database would not have been the case record upload to upload server.
定期进行检查,每间隔1分钟,检查数据库,将尚未上传的事件记录上传至服务器端。
Periodic inspection, each one minute interval check database would not have been the case record upload to upload server.
定期进行检查,每间隔1分钟,检查数据库,将尚未上传的事件记录上传至服务器端。
应用推荐