At the initial stage of development, the main oil production methods give priority to hydraulic piston pump and closed hot water circulation.
开发初期,主导开采方式主要以“水力活塞泵、闭式热水循环”等采油工艺为主。
For the convenience of policy decision in the initial stage of development, the method of determining the FWG3 decline development model is proposed.
提出了开发初期FWG3递减开发模型的确定方法,便于开发初期决策。
For the convenience of policy decision in the initial stage of development, the method of determining the FWG3 decline development model is proposed.
提出了开发初期FWG3递减开发模型的确定方法,便于开发初期决策。
应用推荐