• The critical path controlling the first power generation of Sanbanxi Hydropower Station is the construction of the diversion tunnel and dam as well as the initial filling of the reservoir.

    三板溪工程导流洞大坝施工以及水库初期蓄水控制机组发电工期关键线路。