• The RCC initial-set time is the main basis of determining layer intermission time. The length of initial-set time affects the construction techniques and quality control measures.

    碾压混凝土初时间确定层面允许间歇时间主要依据,初凝时间的长短会影响施工工艺质量控制措施。

    youdao

  • The total call strength, access delay and average access calls for the main control channel are derived according to the initial call strength and discrete access frame length.

    根据系统初始呼叫强度离散接入推导出系统主控信道总的业务量、接入时延及每时隙的平均接入个数,分析了离散接入帧长对上述参数的影响。

    youdao

  • The total call strength, access delay and average access calls for the main control channel are derived according to the initial call strength and discrete access frame length.

    根据系统初始呼叫强度离散接入推导出系统主控信道总的业务量、接入时延及每时隙的平均接入个数,分析了离散接入帧长对上述参数的影响。

    youdao