• The increase in project duration normally translates into an increase in the cost of Labour as the Labour is deployed on daily wages basis.

    增加项目期限通常转化为增加劳工成本,劳工部署工资基础上。

    youdao

  • However, an increase in the size of the plumbing crew reduced the project duration to 229 days.

    不过增加大小管道船员减少项目执行期已229天。

    youdao

  • However, an increase in the size of the plumbing crew reduced the project duration to 229 days.

    不过增加大小管道船员减少项目执行期已229天。

    youdao