• Back in the process inspector, click the Refresh button, as shown in Figure 28.

    回到流程inspector单击Refresh按钮如图28所示。

    youdao

  • D reject rework parts must be approved by the final inspector after passing inspection, in process inspection records "record", before packing.

    合格品返修必须检员检验合格记录工序质检记录表》中,方可包装。

    youdao

  • Formal record in place which indicates relevant process name, machine number, inspector name, time interval, inspected items, judgment, etc.

    正规纪录清楚注明相关工序名称机器号码检查员名字时段检验专案,判定等。

    youdao

  • Manage QC inspector and Lab inspector, and coordinate them to finish the inspection of the raw material, in-process and finished product in time.

    负责制定来料检验过程检验,成品检验质量控制计划,协调检验员检验。

    youdao

  • The basic contents of quality control in coating process, basic requirements for coating inspector, technical training and et al are introduced.

    介绍涂装质量检查基本工作,涂装检查人员的基本工作要求技术培训

    youdao

  • The basic contents of quality control in coating process, basic requirements for coating inspector, technical training and et al are introduced.

    介绍涂装质量检查基本工作,涂装检查人员的基本工作要求技术培训

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定