• In Figure 3c, the pink line represents the data collected for the test running on the Rational Quality Manager server with a 500k repository.

    3c中粉红色的代表测试所收集数据会在500 k存储库的Rational QualityManager服务器运行

    youdao

  • Two key questions in test running homemade PET spunbonded needle punched nonwovens production line are introduced in the paper. Method to solve these key questions are explained.

    介绍国产聚酯针刺非织造生产线生产调试过程中的两个关键问题说明调试过程关键问题的解决办法

    youdao

  • Varied measures against interference are taken in test running the major problem of "zero-reset interference" is overcome by the isolation method of control-line disconnection.

    调试中采取了多种抗干扰措施重点中断控制线隔离解决种特殊干扰问题

    youdao

  • Varied measures against interference are taken in test running the major problem of "zero-reset interference" is overcome by the isolation method of control-line disconnection.

    调试中采取了多种抗干扰措施重点中断控制线隔离解决种特殊干扰问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定