At the same time, the construction method is presented of the final joint in Changhong immersed tube tunnel.
同时,介绍了常洪沉管隧道最终接头的施工方法。
Immersed tube tunnels are often analyzed by using the method of beam or plate on elastic foundation which can not precisely simulate the behavior of joints.
沉管隧道纵断面结构计算常采用弹性地基梁或弹性地基板法,但这些方法较难真实模拟沉管隧道的受力情况,特别是接头的受力情况。
This thesis focuses on the theory and the method, and studies all measurements required in the project of immersed tube tunnel.
本文重点在理论上和方法上对沉管隧道施工所需的各项测量工作进行了研究。
A surveying method of real time monitoring for immersed tube was introduced.
介绍了在沉管隧道施工中,实时监测沉管沉放的一种测量方法。
A surveying method of real time monitoring for immersed tube was introduced.
介绍了在沉管隧道施工中,实时监测沉管沉放的一种测量方法。
应用推荐