• A dated inspection label or other suitable identification of compliance must be affixed to each item upon passing the inspection by the assigned facility Tool Inspector.

    所有指定工厂工具检查员检查合格项目,都必须贴上注有日期的检查标签其他适用合格证

    youdao

  • On the identification of the facility for testing, is responsible for the design of the main structural reinforcement drawings and other external reinforcement drawings audit proofing.

    原有厂房进行检测鉴定负责主体结构加固图纸设计外围加固图纸审核校对

    youdao

  • HAZOP (hazard and Operability Study) is the main technique for the identification of process hazards in the design and operation of a facility, and it is widely used in the developed country.

    HAZOP(危险可操作性研究)装置设计操作进行危害识别主要手段发达国家应用广泛

    youdao

  • Uniform design and receiving facility monopoly related store requirements, brand identification and user sales installation of a single, unified service norms.

    统一设计接收设施专卖相关店面要求专卖标识用户销售安装统一服务规范

    youdao

  • The facility does not withhold workers' government-issued identification (passports or work permits) upon hire.

    雇佣员工时,不能扣留员工的证明资料,比如户口簿工作许可证。

    youdao

  • The facility does not withhold workers' government-issued identification (passports or work permits) upon hire.

    雇佣员工时,不能扣留员工的证明资料,比如户口簿工作许可证。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定