• Finally gives Lantsang Hydropower Planning centralized control center and design of the overall program.

    最终给出澜沧江梯级电站集控中心整体规划设计方案

    youdao

  • Water Resources and Hydropower Planning is a compulsory professional curriculum for Hydraulic and Hydropower Engineering.

    水利水能规划课程水利水电工程专业必修课

    youdao

  • It is a new topic of optimization in the system of water resources and is of great economic importance for hydropower planning.

    水资源系统最优化问题研究中的一个课题,它能使水能规划工作带来显著的经济效益,得到更优的梯级电站总保证出力。

    youdao

  • Aiming at the problem of the existent comprehensive optimization model, this paper presents a new attribute recognition model for hydropower planning scheme optimization.

    针对目前水利水电规划方案综合优选方法存在问题提出了基于变异系数权重水利水电规划方案综合优选属性识别模型

    youdao

  • Conditions and general layout planning for Letan Hydropower Station are presented.

    介绍水电站施工布置条件施工总体布置规划

    youdao

  • This is a new probe in the field of planning and design on the office and living quarter for construction and management of hydropower projects.

    水电工程建设管理办公生活区规划设计进行的新的探索

    youdao

  • This thesis hopes to offer the reference for hydropower cascade development and navigation planning in the Jinsha river.

    金沙江流域水电梯级开发航运规划提供参考

    youdao

  • Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.

    龙首二级水电站黑河水能梯级规划第七座梯级电站

    youdao

  • The whole process of hydropower engineering including planning, designing, construction and management are very complex.

    水利水电工程规划设计施工管理过程都是极其复杂的。

    youdao

  • Cambodia is planning to build several large hydropower projects in the Cardamom mountains that will potentially displace thousands of people.

    柬埔寨计划豆蔻山脉修建许多可导致几千迁移的大型水电项目

    youdao

  • The dynamic benefits are of significance to economic benefits evaluation of emergency reserves of hydropower stations, and to optimum planning and operation of power system as well.

    本文提出水电站(包括常规水电站抽水蓄能电站)以其空闲容量向系统提供补充事故备用之动态效益定量评估方法

    youdao

  • Thai energy planners are now planning to import hydropower from neighboring Laos, Burma and Yunnan Province in China instead to sate the country's high energy demands.

    泰国能源规划者现在打算邻国老挝缅甸中国云南省进口水电满足国内高涨能源需求

    youdao

  • Thai energy planners are now planning to import hydropower from neighboring Laos, Burma and Yunnan Province in China instead to sate the country's high energy demands.

    泰国能源规划者现在打算邻国老挝缅甸中国云南省进口水电满足国内高涨能源需求

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定