• At present, deep study on in-plant overflow type hydropower house has not been done.

    目前,对厂内溢流式水电站厂房的动力特性尚未深入研究

    youdao

  • The initial stress field is the basic data for the design and construction of large underground hydropower house.

    初始应力场大型地下厂房设计施工基础资料

    youdao

  • The analysis of free vibration of hydropower house by means of two methods are deformation of inclination Angle and slope deflection.

    本文首先叙述两种方法(倾角变位角变位移法)分析水电站厂房特性。

    youdao

  • In chapter 1, the existed problem and current research on vibration of hydropower house with large-sized Francis turbine generator unit are introduced.

    第一章介绍了大型混机组厂房振动问题研究现状

    youdao

  • The structure of preloading filling spiral case is becoming larger and more complex correspondingly, and it is widely used in large hydropower house because of its reliability.

    在已建大型电站充水保蜗壳结构以其独特的结构优势可靠性得到了广泛的应用。

    youdao

  • Outlet air temperature of underground tunnel can meet ventilation design demand of hydropower house. Tunnel ventilation can provide a comfortable working environment for the house.

    坝体廊道出口处空气温度满足水电站厂房通风空调设计要求,廊道送风可以厂房提供良好工作环境

    youdao

  • In general, the head pressure of power station in river channel is lower comparatively, but the unit discharge is always greater, in this way, the dimension of the hydropower house is usually larger.

    河床水电站水头比较单机流量通常较大,这样水电站厂房进水口、蜗壳和尾水管等尺寸较大。

    youdao

  • Across the river, the corrugated-iron roofsof a prefabricated barracks glint in the midday sun. They house hundreds ofChinese labourers working on the Myitsone hydropower project.

    对面预制棚屋的波形铁皮屋顶正午阳光的照耀闪闪发光。

    youdao

  • An structure analysis in columnar power house of Extension Project of Dahua hydropower station is made by 3d element program and considering three different water levels.

    大化水电站扩建工程圆筒式厂房,3种不同水位下,通过有限元程序进行了结构分析,结果表明圆筒结构合理。

    youdao

  • The analyses and research are based on underground power house of Three Gorges Hydropower Station which has the specific background of engineering.

    本文的分析研究基于三峡电源电站地下厂房工程明确工程实践背景

    youdao

  • Since Gongzui Hydropower Station put into operation, the tail water level always threaten the flood control safety against pow er-house (in di cating powerhouse on the ground).

    水电站运行以来,水位的抬高一直威胁厂房(指地面厂房)消防安全

    youdao

  • The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.

    小山水电站工程钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。

    youdao

  • Some conclusions assumed from the research and design of Jiangkou power house is quite useful for all the underground Hydropower Station.

    本文观点结论地下厂房工程设计有着一定的普遍意义

    youdao

  • Some conclusions assumed from the research and design of Jiangkou power house is quite useful for all the underground Hydropower Station.

    本文观点结论地下厂房工程设计有着一定的普遍意义

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定