It is proved that effective control of the big size rocks can be achieved (Less than 8%) and the material gradation meets the requirements of the hydro power project.
实践证明,大块率得到了有效控制(小于8%),石料级配符合水工设计要求。
It is proved that effective control of the big size rocks can be achieved (Less than 8%) and the material gradation meets the requirements of the hydro power project.
实践证明,大块率得到了有效控制(小于8%),石料级配符合水工设计要求。
应用推荐