• The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.

    建立了热轧无缝钢管生产计划问题混合整数线性规划模型

    youdao

  • This paper deals with the problem of hot rolling scheduling in iron and steel pl ants, and it is treated as a multiple traveling salesmen problem with capacity constraints and a heuristic is proposed.

    研究钢铁厂热轧调度问题,将其转化带有能力约束旅行问题,对此给出一个启发式算法。

    youdao

  • This paper deals with the problem of hot rolling scheduling in iron and steel pl ants, and it is treated as a multiple traveling salesmen problem with capacity constraints and a heuristic is proposed.

    研究钢铁厂热轧调度问题,将其转化带有能力约束旅行问题,对此给出一个启发式算法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定