• The VRPTW model that is suitable to resolve the problems of the production lot planning of the hot rolling strip is suggested.

    分析热轧生产批量计划通用模型基础上,采用了带有时间窗的车辆路径问题模型。

    youdao

  • The model system of steelmaking-continuous casting-hot rolling integrated production planning is studied, and an integrated production planning model method is suggested.

    研究了炼钢-连铸-热轧一体化生产计划编制模型体系提出一种一体化生产计划编制模型体系方法

    youdao

  • A special asymmetric vehicle routing problem is presented for modeling the hot rolling lot planning since it accords with the production practice.

    本文提出了更为接近热轧批量计划编制实际特殊不对称车辆路径问题作为热轧批量计划编制问题的数学模型

    youdao

  • A special asymmetric vehicle routing problem is presented for modeling the hot rolling lot planning since it accords with the production practice.

    本文提出了更为接近热轧批量计划编制实际特殊不对称车辆路径问题作为热轧批量计划编制问题的数学模型

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定