The HM2 SV will be produced at a pace of 3-4 a month until 18 are completed, thereby ending the line of watches produced from Büsser’s Horological Machine No. 2.
HM2SV将会以3到4月的进度来完成这18枚手表的制作,进而结束Büsser 的Horological MachineNo. 2的钟表生产线。
The HM2 SV will be produced at a pace of 3-4 a month until 18 are completed, thereby ending the line of watches produced from Büsser’s Horological Machine No. 2.
HM2SV将会以3到4月的进度来完成这18枚手表的制作,进而结束Büsser 的Horological MachineNo. 2的钟表生产线。
应用推荐