• The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.

    武山铜矿南矿带采用上向水平分层进路水砂充填法回采,采场多次发生冒顶、片帮。

    youdao

  • The rock movement between the horizontal section of the top coal caving and inclined slicing of the top coal caving was analyzed.

    运用相似材料模拟和数值计算的方法,对水平分段和倾斜分层放顶煤开采引起的围岩移动特征进行了比较。

    youdao

  • The rock movement between the horizontal section of the top coal caving and inclined slicing of the top coal caving was analyzed.

    运用相似材料模拟和数值计算的方法,对水平分段和倾斜分层放顶煤开采引起的围岩移动特征进行了比较。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定