To solve these key problems, it is essential to carry out high speed wind tunnel tests and deal with testing technical problems thereof.
要解决这些关键气动力问题,必须进行一系列相关的大型高速风洞试验,以及解决相应的试验技术问题。
Based on traditional support system in wind tunnel testing, the combination support system measuring support interference on high angles of attack model in low speed wind tunnel was designed.
基于传统的风洞试验支撑设备,设计了用于低速风洞测量大攻角模型支架干扰的组合支撑设备。
The layout of developing the large dimension wind tunnel, high Reynolds number wind tunnel, high-energy facility, will improve the simulative ability of wind tunnel and enhance the testing level.
规划中大尺寸风洞、高雷诺数风洞、高能量气动设备的研制,将使风洞模拟能力和测试水平实现新的飞跃。
Instead of the sonic nozzle, low supersonic nozzles have been utilized to solve the choking problem in transonic wind tunnel testing of high angle-of-attack and high blockage.
本文介绍用低超声速喷管代替声速喷管,解决了大迎角大堵塞度跨声速实验时的风洞壅塞问题。
The extension of the field of wind tunnel testing into the higher-speed regimes has made it advisable to revise Wind Tunnel Testing into low-and high -speed coverages .
鉴于风洞试验已扩展到更高的速度范围,因此有必要将原著《风洞试验》一书进行修订,并分编为《高速风洞试验》和《低速风洞试验》两部出版。
To solve these key problems, it is essential to carry out high speed wind tunnel tests and deal with testing technical...
要解决这些关键气动力问题,必须进行一系列相关的大型高速风洞试验,以及解决相应的试验技术问题。
To solve these key problems, it is essential to carry out high speed wind tunnel tests and deal with testing tec...
要解决这些关键气动力问题,必须进行一系列相关的大型高速风洞试验,以及解决相应的试验技术问题。
To solve these key problems, it is essential to carry out high speed wind tunnel tests and deal with testing tec...
要解决这些关键气动力问题,必须进行一系列相关的大型高速风洞试验,以及解决相应的试验技术问题。
应用推荐