• 7 hr 30 min Even after operators pump water into the primary loop, pressure is still high. The PORV 'backup valve is opened to lower the pressure.

    7小时30分钟尽管操作员已将入主回路,但温度仍然很高减压阀备用阀门打开减少压力

    youdao

  • 7 hr 30 min Even after operators pump water into the primary loop, pressure is still high.

    7小时30分钟尽管操作员已将入主回路,但温度仍然很高

    youdao

  • The steam-water two-phase flow instability in vertical parallel pipes was studied experimentally in the high pressure steam-water test loop.

    高压汽水回路上对垂直并联中汽液两相不稳定性进行了试验研究。

    youdao

  • Through the tests of mechanical properties of charging hydrogen and the corrosion tests in loop water of high temperature and high pressure, hydrogen brittleness of T225NG Ti-alloy was studied.

    通过试样常温力学性能试验双悬臂梁试样高温高压纯水中的腐蚀试验来研究t 225ng钛合金的氢脆行为。

    youdao

  • Extensive experiments of steam-water two-phase flow and boiling heat transfer in a vertical helically-coiled tube were carried out in high pressure water test loop of Xi an JiaotongUniversity.

    报导了西安交通大学高压汽水实验回路上进行的垂直螺旋管内汽水两相流传试验研究。

    youdao

  • Extensive experiments of steam-water two-phase flow and boiling heat transfer in a vertical helically-coiled tube were carried out in high pressure water test loop of Xi an JiaotongUniversity.

    报导了西安交通大学高压汽水实验回路上进行的垂直螺旋管内汽水两相流传试验研究。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定