The research results will provide references to tunnel waterproofing and drainage system design in high water pressure and water-enriched regions including subsea regions.
研究成果对类似高水压富水区以及海底隧道防排水设计具有一定的参考价值和借鉴作用。
Mechanical behavior of lining structure is analyzed under 10 different conditions that high water pressure suddenly effluent water upon 8 different parts of tunnel section with FEM numerical model.
用有限元数值模型,分析隧道断面上8个不同位置10种不同水压突水条件下衬砌结构的受力特征。
The pressure field measurement results on the wing surface of airplane model by luminescence pressure sensor (LPS) technique and classic tap technique in high speed wind tunnel are presented.
介绍了国内首次在高速风洞中使用荧光压力传感器(LPS)技术对飞机模型机翼表面压力场测量的初步结果。
Considering the high cost for Iining pressure tunnel a considerabie economic advantage can be obtained if pressure tunnels keep unlined completely or only partly.
由于衬砌水电站压力隧洞费用极高,如果能取消、即使部分取消压力隧洞的钢板衬砌,将能得到极大的经济效益。
PSI8400 pressure test system is of high precision pressure measurement equipment produced by PSI Inc. of USA and it is used in pressure measurement test of wind tunnel widely.
P SI8400电子压力测试系统是美国压力系统公司生产的高精度的压力测量设备,广泛应用在风洞压力测量试验中。
Brief introduction of engineering case for treatment of bridge and culvert soft foundation with gravel pile and of tunnel soft foundation with high-pressure jet grouting pile.
简单介绍了采用碎石桩进行桥涵软基处理,采用高压旋喷桩进行隧道软基处理的工程实例。
The mechanical behavior and deformation characteristics of lining structure in Yuanliangshan tunnel under high water pressure was analyzed by using 3d FEM numerical model.
采用三维有限元数值模型,分析圆梁山隧道高水压条件下衬砌结构受力及变形特征。
The poor geological conditions that the tunnel confronts include high-pressure water, coal seam, goaf, gas, Karst and fault.
隧道穿越不良地质有:高压力水、煤层、采空区、瓦斯、岩溶、断层等。
The comparison and analysis on the finite element method and the boundary element method of high-pressure pervious lining tunnel have been conducted.
主要进行了有限元法高压透水衬砌隧洞和边界元法高压透水衬砌隧洞的比较分析。
Underground tunnel, high pressure bifurcated pipe, water inlet tunnel designing and their lining style need know crustal stress too.
地下洞室和高压岔管、输水隧道设计及选择衬砌方式,需要查明原地应力状态。
The calculation method can preferably reflect the actual stress and strain situation of hydraulic tunnel with high pressure with seepage from inner tunnel to outer tunnel.
该计算方法较好的反映了水工高压隧洞的内水外渗后实际受力变形情况。
The suitable grouting parameters for Yuanliangshan tunnel. are verified by analyzing particular karst aquifers within high pressure and rich water zone.
针对圆梁山隧道高压富水区的岩溶水分布特点,确定了合理的注浆范围和注浆参数。
Plasma wind tunnel is equipment which can generate high-temperature and high-pressure to simulate the air environment of aerospace reentry vehicles.
电弧等离子体风洞是一种能产生高温、高压的热源设备,用于在地面模拟航天用再入式飞行器的气动环境。
Mountain tunnel construction with high water pressure will apply the tunnel boring machine method (TBM) more and more.
长大深埋高水压山岭隧道的施工将越来越多地采用隧道掘进机法。
Defect on air pressure vessel materials of high speed wind tunnel resource was inspected by means of ultrasonic radiographic and magnetic particle.
对高速风洞气源气罐全厚材料用超声、磁粉、射线等方法进行了缺陷检测。
There is high pressure and abundant water in MaoBa syncline where Yuanliangshan tunnel lies, that brings a great many difficulties for design and construction of the tunnel.
圆梁山隧道所处毛坝向斜存在高压富水,给隧道的设计与施工带来了很大的难度。
There is high pressure and abundant water in MaoBa syncline where Yuanliangshan tunnel lies, that brings a great many difficulties for design and construction of the tunnel.
圆梁山隧道所处毛坝向斜存在高压富水,给隧道的设计与施工带来了很大的难度。
应用推荐