The structure is sheltered by a high embankment .
桥被一个高堤挡住了。
The deformation and destroying of high embankment is the common problem of high way.
高填路堤的变形破坏是公路工程质量通病之一。
It is of great significance to study high embankment settlement back analysis and prediction.
因此,研究高速公路高填方路基沉降反分析与预测具有重要的意义。
This paper introduces design and test of the pipe used in the circular pipe culvert under high embankment.
介绍了高填方路段圆管涵管节的设计和试验。
Loess high embankment oneself person who compress account for embankment always about 10% of subsiding etc. , ignore.
黄土高路堤自身压缩量占路堤总沉降量10%左右,是不容忽视的。
By analyzing and discussing settlement after construction of fillings in the article, it is show that stone is prior to soil to fill high embankment.
本文对填筑体的工后沉降进行了较为深入的分析探讨,验证了高填方填筑体应优先采用石料的结论。
By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.
北京市音乐堂改扩建工程采用“两桩托一柱”的方法,转换结构传力体系,实现了基础整体托换,并增设了地下室,充分利用地下空间资源。
According the in-situ test and the calculating result of the finite element program, the stress and deformation properties of the culvert with high embankment are studied.
过现场测试结果,并结合有限元计算,研究作用与高填涵洞的受力与变形。
Based on the existing achievements on settlement prediction, the dissertation summarizes and researches on the practical calculation methods for high embankment settlement.
本文在汲取以往对沉降预估研究成果的基础上,对高填方路基沉降反演及预测的实用计算方法进行了进一步的总结和研究。
The prediction accuracy of this method is verified through the calculation of engineering practice and this method has great practical value in the settlement monitoring of high embankment.
通过实例计算表明,该法预测精度高,在高路堤沉降监测中具有较大的实用价值。
Based on the characteristics and the deformation destroying of high embankment, the main reasons for the deformation destroying are analyzed and the method to resolve the problem is suggested.
根据高填路堤的特点及其变形破坏的表现形式,深入分析了高填路堤变形破坏的主要原因,并提出了高填路堤变形破坏的处理对策。
The rising of permafrost table should be attributed to an obvious decrease in fluctuation of temperature at the depth of permafrost table due to the thermal resistance effect of high embankment.
多年冻土上限的抬升主要是由于高路基的热阻效应导致上限附近土层温度变幅急剧减小而形成的。
All exponential models, power function models, root-squaring models, hyperbolic models, but logarithm models can't disclose the laws of the post - construction settlement of the high embankment.
在指数模型、幂函数模型、平方根模型、双曲线模型和对数模型等回归参数模型中,只有对数模型能较真实反映高填方地基工后沉降规律。
Based on observed data of two monitoring sections in Beiluhe test site of Qing-Zang Railway, the characteristics of underlying ground thermal regime after constructing high embankment are analyzed.
基于青藏铁路北麓河试验段两个监测断面的地温监测资料,分析了修筑高路基后下伏土层的热状况变化特征。
At last, design method as well as construction craft and quality control specification of the technology of reinforcing soft loess foundation under high embankment with pile-raft system is proposed.
最后提出了桩-筏式复合地基处理软黄土地基方法及其设计与施工方法。
With the construction of highway developing in the mountains, high filling embankment behind abutment will be inevitably encountered.
随着高等级公路建设在山区的开展,不可避免地会遇到桥头高填路基问题。
Ms Thorp said she would have struggled to work a full day in high heels and had asked to wear the smart flat shoes she had worn to the office in Embankment.
索普女士说,穿高跟鞋工作一整天太痛苦,所以她要求穿自己在堤坝站的工作地点穿的时髦的平底鞋。
Settlement after construction is one primary problem of high-filled embankment.
路面的工后沉降问题是高填方路堤工程的主要问题之一。
Through analysis, the main reasons of high fill embankment faults are unreasonable design and construction of subgrade.
通过分析指出路基设计不合理以及施工工艺不当是造成高填方路堤常见病害的主要原因。
There are many reasons that arouse the wreck of the high filled embankment.
引起高填路堤破坏的原因是多方面的。
The high earth filled embankment possesses a series of demerits, so the freeway low embankment design is an inexorable trend.
高填土路堤具有一系列的缺点,所以高速公路进行低路堤设计是一种必然的趋势。
There are near 26 ten thousand kilometers embankment and 8 ten thousand reservoirs in our country, the proportion of the disease in the dike is high.
我国江河堤防近26万公里,水库8万多座,病险水库堤坝占有率较高。
Rockfill stuff and subgrade soil should be studied on settlement rule for high rockfill embankment respectively, for the differences of the pressurized state and settlement rule.
由于填石料与地基土的受力性能不同,沉降规律也大不相同,因此提出先分别考虑路基和填石料的变形,然后再叠加的方法来研究高填石路堤沉降规律。
The result is reasonable, and it also shows that the effecting factors of the stability of high-reinforced embankment can be described more prehensively by the method.
通过对北张沟加筋高填方路堤进行稳定性评价,表明该方法能更全面考虑填方加筋路堤边坡稳定性的影响因素,评价结果合理。
When using intense weathering soft rock to fill high grade highway embankment, compaction characters and wetting deformation characters are the major indices to estimate the filling performance.
强风化软岩用于高等级公路路基填筑时,压实特性和湿化变形特性是评价填料性能的主要指标。
High fill embankment foundation settlement calculations, without considering the construction process, the calculated results with field test results there is a big difference.
对高填方路堤地基的沉降计算,若不考虑施工过程,其计算结果与现场实测结果就存在很大的差别。
To construct high grade road in the mountainous area will meet the high filled embankment inevitably, the high filled embankment has become one main structure form of the roadbed.
在山区修建高等级公路,不可避免会遇到大量的高填路堤,高填路堤已成为路基的主要结构型式之一。
To construct high grade road in the mountainous area will meet the high filled embankment inevitably, the high filled embankment has become one main structure form of the roadbed.
在山区修建高等级公路,不可避免会遇到大量的高填路堤,高填路堤已成为路基的主要结构型式之一。
应用推荐