• Can't we visit the High Dam?

    我们难道不能参观高坝吗?

    youdao

  • The high Dam at Aswan was completed in 1970.

    阿斯旺的高坝于1970年完工的。

    youdao

  • The Jiangya dam is a high dam with RCC overall section.

    大坝全断面碾压混凝土(RCC高坝

    youdao

  • There have been positive and negative effects for the Aswan High Dam. .

    肯定阿斯望高坝高效否定其影响

    youdao

  • Egypt′s leadership in the Arab world was cemented by the Aswan High Dam.

    埃及阿拉伯世界领导地位建造阿斯旺大坝巩固

    youdao

  • After 11 years of construction, the Aswan High Dam in Egypt is completed.

    历经11修建后,埃及阿斯旺水坝竣工完成。

    youdao

  • 1970 - After 11 years of construction, the Aswan High Dam in Egypt is completed.

    1970今天,历经11修建埃及阿斯旺水坝竣工完成。

    youdao

  • Mayantong Hydropower Station will be exploited by taking high dam and diversion way.

    岩洞水电站采取高坝引水开发

    youdao

  • For the RCC high dam embedding high strength polyethylene cooling water pipe is studied.

    RCC高坝埋设强度聚乙烯冷却水管技术进行了研究。

    youdao

  • The first new design was by Alexander Gorlov, a Russian civil engineer who worked on the Aswan High Dam in Egypt.

    第一设计俄罗斯土木工程师亚历山大.佐罗夫完成的,他先埃及阿斯旺大坝工作后来移居到美国

    youdao

  • You can also visit the Aswan High Dam and the water it collects in Lake Nasser, the largest man-made lake in the world.

    可以游览阿斯旺大坝由此而形成塞尔世界最大人工湖

    youdao

  • The fluctuating pressure in joints of the bed rock may be a main factor to destroy the bed rock lower reach of a high dam.

    高坝下游基岩缝隙水流压力脉动可能造成基础破坏的一个基本因素

    youdao

  • There is only one way to appreciate the scale of Egypt's monumental Aswan High Dam, and that is by standing directly on top of it.

    欣赏阿斯旺大坝壮美只有一个办法就是登上坝顶

    youdao

  • They were formed in the 1990s by diverting water from lake Nasser, an artificial lake formed behind the Aswan High Dam on the river Nile.

    它们由于1990年代纳赛尔湖调水而形成的,是尼罗河阿斯旺大坝后面形成的人工湖

    youdao

  • On these basis and combined with reality, several technical measures for safely and highly efficient running of high dam are put forward.

    基础结合实际提出了针对该尾矿高坝安全高效运行几点技术措施

    youdao

  • Simulation of hydraulic fracturing of rock mass is an important issue in the construction design of high dam and deep-lying tunnel and so on.

    岩体水力劈裂模拟高坝、深隧洞工程施工设计中的重要问题

    youdao

  • Especially in high dam project with high seepage and pore water pressure, the degradation of material properties of concrete affects more evidently.

    特别是渗透孔隙压力作用下,混凝土材料性能劣化现象明显,严重影响工程安全性能。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上最大三项人造工程中国长城埃及金字塔阿斯旺高坝,埃及。

    youdao

  • Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    世界上三个最大人造工程,它们中国长城埃及金字塔阿斯旺高坝,后者也是埃及境内。

    youdao

  • 37a section of Lake Nasser in Egypt, a massive reservoir behind the Aswan High Dam on the Nile River, seen from the International Space Station in January of 2010.

    2010年1月份国际空间站上拍摄到埃及纳赛尔湖,这座尼罗河阿斯旺大坝大型水库

    youdao

  • "Before they started the High Dam 25 years ago," he said, "the Nile mud had a lot of food in it, and so the sardines gathered near the mouth of the river to feed."

    二十五年前修建高坝之前尼罗河泥沙里很多的东西,所以沙丁鱼就聚集在河口找食吃。”

    youdao

  • It is difficult to build a dam in the sea, and the cost is very high.

    海里建水坝十分困难,成本也很高。

    youdao

  • Where damage has been identified, it has been cracking high in the dam and where additional features such as curbs, railings, gates, or guard or control houses are located.

    大坝确认收到破坏的部位,大都是在较高部位出现裂缝那里特点是附设有连接装置,护栏,泄水闸门警卫控制室等。

    youdao

  • The remaining portion of the dam adjacent to the damaged area also experienced high accelerations and separated from its foundation bedrock.

    大坝受损位置相邻其他部分同样受到加速冲击脱离了地基岩体。

    youdao

  • The dam wall is 870 ft. (265 m) high - taller than the Hoover dam - and when completed, the dam formed a reservoir 47 miles (75 km) long that completely submerged the old town of Tehri.

    大坝870英尺(265)——弗大坝高——竣工以后大坝形成了一个长达47英里(75千米)蓄水池,完全的特城镇完全陷入水中

    youdao

  • It was theorized with a high degree of probability that the change in period was due to the nonlinearity of the hydrodynamic pressure acting on the upstream face of the dam.

    推论最大可能性时间段非线性水压作用于坝体上游面所造成差别。

    youdao

  • This can be attributed, in part, to the fact that any cracking caused by the earthquake has mainly been horizontal and located high in the dam together with the reservoir not being full in many cases.

    是因为地震引起裂缝主要水平方向的,而且位于大坝的高处,水库一般不是量蓄水。

    youdao

  • This can be attributed, in part, to the fact that any cracking caused by the earthquake has mainly been horizontal and located high in the dam together with the reservoir not being full in many cases.

    是因为地震引起裂缝主要水平方向的,而且位于大坝的高处,水库一般不是量蓄水。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定