This paper describes the superiority and the technical practicability of the high piled wharf using entirely the straight steel pipes as the foundation.
本文阐述了全部采用直钢管桩基础的高桩码头的优越性和技术可行性。
So, the existed high-piled slab &beam wharf shall he demolished.
为此,需将旧的高桩梁板码头拆除。
The engineering quality of high-level piled wharf related to surveying, bui-Iding material and construction, etc. often affects the quality of the whole project.
高桩码头工程从测量、建筑材料、施工等方面的工程质量往往会影响整个工程的质量。
The formation causes of cracks on concrete surface layer of high-piled wharf are analyzed based on the investigation of wharf surface layers and relevant preventive measures are put forward.
基于码头面层调查分析高桩码头混凝土面层产生龟裂的原因,提出防治措施。
It introduces design of Yingkou Shipping Wharf which adopts high-piled slab & beam structure with long steel pile of large space.
介绍营口航运码头采用钢长桩大跨度的高桩梁板式混合结构的设计。
By analyzing and comparison between the solid model and beam element model for the high-piled wharf, both the advantage and the disadvantage are summarized.
通过对高桩码头实体模型和梁单元模型分析比较,总结了两种建模的优缺点。
It is necessary to keep the advantage and avoid weakness on principle in actual calculating high-piled wharf, so the ANSYS is used in space finite element calculation of the high-piled wharf.
实际的码头结构计算中应根据需要,扬长避短,使ANSYS这一软件更好地应用于高桩码头的空间结构有限元计算。
Measure the vibration of piled wharf in high water, low water and between two times. The largest displacement of vibration is compared three times.
测量了高平潮、低平潮及两潮位之间三个时段某高桩码头工作平台的振动情况,比较了不同潮位下振动的最大位移值。
This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
In this way, the design theory of pile foundation of high-piled wharf, the method of simple calculation is one of the main reason which induced the matter.
出现这些问题的原因一直是国内外学者关心的问题,而高桩码头柔性桩基础的设计理论——简化计算方法的适用条件是导致高桩码头出现问题的主要原因之一。
In this way, the design theory of pile foundation of high-piled wharf, the method of simple calculation is one of the main reason which induced the matter.
出现这些问题的原因一直是国内外学者关心的问题,而高桩码头柔性桩基础的设计理论——简化计算方法的适用条件是导致高桩码头出现问题的主要原因之一。
应用推荐