The high-pressure flushing water pipe is controlled by the time-delay switch.
高压冲水管由延时开关控制。
It should be referenced with workshop's "High pressure testing safety requirement" and "Pipe flushing safety requirement" etc.
应对应于车间的《高压管压力试验安全要求》、《管路串油清洗安全要求》等。
The invention has the characteristics of water saving, low cost, high water pressure, good flushing effect and convenient and labor-saving operation.
本发明具有能节约用水,成本低廉的,水压高,冲洗效果好,并使用户能方便、省力地操作的特点。
The straight blow-off pipe has less blow-off resistance, the flushing area of the swirl nozzles and the fan nozzles is large, the water pressure is high, and the water consumption is less.
直管排污管的排污阻力小,旋 流喷嘴、扇形喷嘴的冲洗面积大、水压高、用水量小。
The straight blow-off pipe has less blow-off resistance, the flushing area of the swirl nozzles and the fan nozzles is large, the water pressure is high, and the water consumption is less.
直管排污管的排污阻力小,旋 流喷嘴、扇形喷嘴的冲洗面积大、水压高、用水量小。
应用推荐