In this paper, a failure model has been obtained for pile groups foundation with large high-pile platform.
本文提出了一种砂土中大型高桩台群桩基础的地基破坏模式,并导出了桩端阻力的理论计算公式。
But mostly, the beam slab structure is adopted as superstructure which causes some weakness in construction and use of high-pile wharf.
但是上部结构却大都采用梁板结构,这使得高桩码头在施工和使用上存在着一些缺点。
I like to think back to high school, when I could bolt down three or four burgers and a pile of French fries.
我喜欢回想高中时,那时我可以一气吞下三四个汉堡和一大堆炸薯条。
The greasy and deep dish didn't pile high with bacon and sausage.
这种油腻的深盘子里并没有高高地堆满熏肉和香肠。
So how high would we have to pile the sandbags?
那么我们需要垒叠多高的沙包防洪呢?
With the unique shape and design of the plate, it's impossible to pile it high with food.
碟子的造型和设计独特了,盛入的食物就无法堆得高高的。
W: The pile is over ten feet high. I am afraid it will fall all over and bury you underneath it if I put this file on top of it.
W:文件已经堆过10英尺高了,如果我把它放上去恐怕文件堆会倒下来把您埋在下面。
Still, there's a natural worry that if you don't go in, the work won't get done, or it will pile up so high you'll never be able to get through it all.
可是很自然的,人们会出现担心不上班就完成不了工作,它将堆积如山,你永远都无法搞定。
Why you should skip it: When you know you can have only one plateful, chances are you will pile it sky-high.
为什么不可取:当你知道自己只能吃一盘食物时,你很有可能将盘子中的食物堆得很高。
He dug until the hole was deep and the dirt pile was high.
他一直挖,直到坑很深了,挖出的土堆得很高了。
The game was graphically elegant and easy to grok. To play, you arranged seven different kinds of falling blocks into a tower without letting them pile too high.
这款游戏图形优雅、易于理解:游戏时,你要把不断落下的七种不同的方块垒成一个塔,同时不要垒得太高。
This is really all part of the same "search for yield" that has seen investors pile into other high-income assets, such as corporate bonds and emerging-market debt.
这和“搜寻收益”,也就是投资者蜂拥进入其他的高收益资产,例如公司债券和新兴市场债,如出一辙。
Instead, I was given a plate and a large group of middle-aged ladies in headscarves took turns to pile it high with home-baked cakes and savoury pastries.
然而有人给了我一个盘子,一群戴着头巾的中年妇女在盘子里高高堆起了自家烤制的糕饼和风味点心。
An international study has discovered why some people who eat a high-fat diet remain slim, yet others pile on the weight.
为什么有人经常吃高热量食物,却始终保持体态苗条,而另一些人却控制不住体重的飙升?一项国际研究揭开了其中的奥秘。
One explanation is that investors pile into the stockmarkets of high-growth countries until they become overvalued.
有一种解释认为投资者们蜂拥进入那些快速增长国家的股票市场,最后导致股票市值被明显高估。
Storm surges are caused by a hurricane's high winds, which pile up a "mound" of water along the front of the eye as the storm moves forward.
飓风的狂风导致风暴潮,在面前堆起一座“水堤”随着风暴往前移动。
The old man stood on a pile of bricks almost as high as a house.
那位老人站在一堆跟房子差不多高的砖上。
We fired the little pile, which blazed high and hot.
我们在那小堆东西上放火,它就发光发热起来。
The main building of the Beichuan Middle School, a seven-story structure, had been reduced to a pile of rubble about 2 meters high.
原本七层的北川中学主教学楼,已经成为了仅高两米的废墟堆。
High voltage silicon pile is the key component of the output circuits of color TV and color monitor, whose switch frequency is the direct restrictive factor of line scan.
高压硅堆是彩电和彩色显示器行输出电路中的关键器件,其开关速度的快慢直接限制了行扫描频率的高低。
The operation, should avoid high voltage line and elevated grid, to ensure the pile machine drill stand erect not be affected.
作业时,应避开高压线路及高架电网,以保证按桩机钻架的架设不受影响。
Based on engineering detection test, the application of high strain dynamic method in steel pile dynamic test is expounded. And the actual application of high strain dynamic testing is discussed.
结合工程检测实践论述了高应变动力测试技术在钢管桩检测中的应用,并对高应变动力测试技术的实际应用进行了探讨。
The basic principle of simple high strain pile test method transformed from measured free fall of drop hammer is given in this paper.
给出测量自由落锤的加速度换算高应变试桩的动力的简易法的基本原理、测试操作与工程应用。
The pile strain of AM bulb cast-in-place pile is tested by high precision sliding micrometer, which can have high precision and reliable testing results.
采用高精度滑动测微计测试AM扩底桩在各级荷载下的桩身应变,测试精度高,测试结果可靠。
The pouring pile has the advantage of high loading capacity and flexible pile diameter.
灌注桩具有承载能力高、桩径尺寸灵活等优点。
Mostly, the soft foundation of the modern high-speed railway is strengthened with pile CFG in order to meet the demands of the intensity, deformation and seismic resistance of the foundation.
为了满足地基强度、变形及抗震等要求,现代高速铁路软基处理大多数采用CFG桩进行加固。
This article discusses the mechanism of consolidating damp and muddy loess ground with high-press churning pile, the selection of parameters, essentials of engineering and quality test, etc.
介绍高压旋喷桩技术在湿陷性黄土地基加固中的机理和设计参数的确定,并介绍了施工工艺要点及质量检验等。
The engineering practice show that, the high - pressure chemical churning pile was effective ground reinforce method in some complex foundations.
本工程实践表明,高压旋喷桩对一些复杂地基,特别是场地孤石较多时,是一种有效的地基加固方法。
The engineering practice show that, the high - pressure chemical churning pile was effective ground reinforce method in some complex foundations.
本工程实践表明,高压旋喷桩对一些复杂地基,特别是场地孤石较多时,是一种有效的地基加固方法。
应用推荐