After the test plan hierarchy is established, test designers can begin to add test cases.
在测试计划层级被建立之后,测试设计者就能够开始添加测试用例了。
A hierarchy such as this also enables you to report the status of test cases belonging to a specific plan, as well as test cases belonging to that plan's child plans.
一个诸如此类的层级能够使您报告属于一个指定计划的测试用例的状态,以及属于该计划的子计划的测试用例的状态。
InfoQ: Do you plan to support a hierarchy of error messages - so I have a standard way of displaying a generic error message that I can override with a page/screen specific error message if I want to?
InfoQ:你们打算支持错误消息的层次吗? ——这样,我能用标准的方式显示一个通用的错误消息,如果我愿意,我可以用页面/屏幕特定的错误消息覆盖那个通用的错误消息。
It's best to have some introductory content in mind, as well as a plan for the first few pages of your hierarchy.
最好事先想好一些介绍性内容,以及最初几个wiki页面的构想。
The test suite hierarchy for your test plan is displayed.
此时将显示测试计划的测试套件层次结构。
You can group your test Cases together by organizing them into a hierarchy of test suites in your test plan.
在测试计划中,您可以将测试案例组合在一起变成测试套件,并按阶层架构组织。
Select the location in the test suite hierarchy pane where you want to add the test suite that you are importing from another plan.
从测试套件阶层窗格中选取一个位置,您要将从其他计划汇入的测试套件加入至该位置。
The test suites in your test plan are added and managed as part of a hierarchy that includes a root node.
测试计划中的测试套件会做为包含根节点之阶层的一部分予以加入和管理。
The analytical hierarchy process is applied to model the plan of forest category structure. An applied example is given.
本文应用层次分析方法,对林种结构的规划建立了模型,并给出一个应用实例。
The test suite hierarchy has a root node that has the same name as the test plan.
测试套件阶层具有与测试计划同名的根节点。
Finally base on the analysis of each risk sources, it establishes the hierarchy risk analysis model and emergency plan management.
最后在对各种风险源分析评价的基础上,建立通信工程建设监理项目风险层次分析模型及预案管理。
Finally base on the analysis of each risk sources, it establishes the hierarchy risk analysis model and emergency plan management.
最后在对各种风险源分析评价的基础上,建立通信工程建设监理项目风险层次分析模型及预案管理。
应用推荐