• At the height of the flood, engineers feared a bridge on the Pawtuxet was going to collapse, taking with it a nearby dam, which in turn could have taken out another dam.

    洪峰到来时,工程人员担心塔克西特河可能倒塌,冲垮附近的一座水坝堵塞另一座水坝。

    youdao

  • The dam was completed in 2006, and the reservoir is being filled up in stages before it reaches the final height of 175 meters by 2009.

    三峡大坝于2006年完工目前正在水库分阶段注水,2009年将达到175米的最终水位。

    youdao

  • The shadows cast onto the old dam and to the building itself indicate the height and the movement of the sun.

    投射大坝发电室本身之上阴影体现太阳高度和位置变化

    youdao

  • Works in such conditions, local materials spillway dam how to coordinate the size and height of buildings to ensure that safety is a major engineering design experience.

    此类工程条件下当地材料如何协调泄洪建筑物规模坝高保证工程安全工程设计的主要经验。

    youdao

  • By random vibration theory, the effects of dam height and foundation stiffness of gravity dam on its seismic response are studied.

    应用随机振动理论,研究了坝基刚度重力坝地震响应影响规律。

    youdao

  • It is able to control both the direction and the height of the dam.

    控制坝体方向,又能控制坝体的高程

    youdao

  • The exit dam has a significant effect on MRT, while the influence of internal structure consisting of various longitudinal ribs and circular ribs is mainly dependent on the height of circular ribs.

    出口挡板颗粒MRT具有十分显著影响不同肋组合构件对MRT的影响主要取决于窑出口处环肋的高度

    youdao

  • Monks, as an example: at the height of summer, some people dam a stream in the woods and, each bringing their bathing things, play in the water.

    和尚就象例子盛夏时节,有些森林溪流里筑了一个人带来了洗浴的用具,在水里嬉戏

    youdao

  • More research is needed on selection of dam site along Yangwo river watershed, the relationship between dam height and water-collecting amount.

    进一步研究羊窝流域筑坝地点选择、筑坝高度与汇水量关系,为羊窝河流域湿地水文恢复工程建设提供依据。

    youdao

  • Nanyi reservoir dam is a concrete gravity dam with maximum height of 96.

    南一水库大坝混凝土重力坝大坝96。

    youdao

  • To monitor the height oftailings dam and forecast its trend, a designed method based on gray system theory to create the model of tailing dam saturation line is presented.

    为了实现对尾矿浸润线高度进行实时在线监测趋势预测提出了用了灰色系统理论尾矿坝的浸润线数据建立灰色模型方法

    youdao

  • The speed of wind and the height of reservior wave are important factors influencing height of landslide-dam.

    人工高超设计方法中,库区风速、浪高等影响坝高因素

    youdao

  • Because the height of the landslide-dam isn't controlled by man, the safe height of landslide-dam needs to be studied.

    由于是自然形成,人为控制,坝高安全程度需要分析研究

    youdao

  • The dam of Lingao Reservoir is a rolled earth dam with relative height and the secondary importance grade.

    岭澳水库土坝座较高的碾压式石坝,为二级建筑物。

    youdao

  • As a general rule of thumb, post-construction settlement of an embankment dam should not exceed 1% of the height of the dam.

    普通说来路基工后沉降水坝不该超越1%地高度地水坝。

    youdao

  • Though optimization of broad of spillway and dam height of silt dam, their optimum combination was found;

    通过溢洪道宽度淤地坝坝优选,找到二者的最佳组合

    youdao

  • Some significant conclusions are remarked as follows:(1) It is validated further that the reinforced range of high earth-rockfill dam is 4/5 height upwards.

    进一步验证石坝抗震加固范围4/5高度以上的坝坡区域。

    youdao

  • The effects of drainage clogging and dam height are most obvious, but dry beach length, permeability of phosphogypsum and anisotropic permeability are weaker.

    长度石膏透水性以及其各向异性等三种因素对坡稳定性影响相对较小。

    youdao

  • The effects of drainage clogging and dam height are most obvious, but dry beach length, permeability of phosphogypsum and anisotropic permeability are weaker.

    长度石膏透水性以及其各向异性等三种因素对坡稳定性影响相对较小。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定