This means that, with 496 hand-dug pile terminal base, such as the completion of preparatory work, Hefei Xinqiao International Airport to start the main works of the date getting closer and closer.
这意味着,随着496根航站楼人工挖孔灌注桩基等准备工作的完成,合肥新桥国际机场主体工程正式动工的日期越来越近了。
This means that, with 496 hand-dug pile terminal base, such as the completion of preparatory work, Hefei Xinqiao International Airport to start the main works of the date getting closer and closer.
这意味着,随着496根航站楼人工挖孔灌注桩基等准备工作的完成,合肥新桥国际机场主体工程正式动工的日期越来越近了。
应用推荐